Laserfiche WebLink
Item No. 07D <br />Meeting Date: September 14, 2015 <br />Type of Business: CB <br />City Administrator Review: ______ <br /> <br />City of Mounds View Staff Report <br />To: Honorable Mayor and City Council <br />From: Brian Erickson, P.E., Public Works Director/City Engineer <br />Item Title/Subject: Resolution 8453, Approving Public Works Facility Space <br />Needs Study Request for Proposals <br /> <br />Introduction <br />The existing Public Works facility was constructed in the early 1960’s and expanded in the late <br />1980’s. This facility, although functional, is significantly undersized for the existing fleet and <br />staff that work out of this building. Some examples include an undersized maintenance bay, a <br />wash rack cannot be closed during washing operations, and a garage space that is barely large <br />enough to contain the existing fleet. As an example the jet-vac is blocked such that a minimum <br />of 3 other pieces of equipment need to be moved in order to remove it from the building. This <br />delays timely response in the event of an emergency. <br /> <br />Discussion <br />As a result, the current Capital Improvement Program (CIP) contains an item for ‘Demo./Const. <br />New Public Works Maint. Facility.’ The design phase is scheduled to begin in 2016, with <br />construction scheduled in 2017. One of the keys to an economically successful design is being <br />able to clearly delineate the size of the facility to be constructed. By performing a space needs <br />study prior retaining a designer; the City of Mounds View will also have a better idea of size and <br />cost for the construction of a new facility. <br /> <br />The attached Request for Proposals (RFP) presents a list of tasks that should be accomplished <br />as part of this study. These tasks include: <br />• Task 1 – Review existing facility and fleet. <br />• Task 2 – Prepare a draft study which includes a moderate future planning factor. <br />• Task 3 – Review the draft study with staff. The draft study will be presented at a City <br />Council work session. <br />• Task 4 – Finalize the study and provide final copies to the City. <br /> <br />Should City Council decide to approve the RFP, the Public Works Director will forward the <br />proposals to a number of selected consultants. Upon receipt of the proposals, staff will rank <br />them and make a recommendation to the City Council for award. As part of the <br />recommendation Staff will return with a resolution recommending award and amending the <br />budget to fund this work. At this point in time, it is anticipated that the Special Projects fund will <br />be used to complete this project. There is sufficient fund balance to cover this expenditure. <br /> <br />A rough schedule for this project has been drafted and is shown below. <br />September 14, 2015 – City Council approves the Request for Proposals (RPF) for the <br />Space Study.