My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2014/01/27
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2014
>
Agenda Packets - 2014/01/27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:08 PM
Creation date
6/19/2018 5:53:39 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
1/27/2014
Supplemental fields
City Council Document Type
City Council Packets
Date
1/27/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
January 20, 2014 <br />Nick DeBar <br />Public Works Director <br />City of Mounds View <br />2401 County Road 10 <br />Mounds View MN 55112-1499 <br />�h,'' rl/fid <br />P.O. Box 897 • 3394 Lake F.Imo Ave. N o Lake ❑mo, NN 55042 <br />(651) 773-5111 e Fax (651) 773-5222 <br />By Email Only <br />RE: Updated Cost Estimate for the Recommended Repairs to the 2,000,000 <br />Gallon Concrete Ground Storage Reservoir in Mounds View, MN <br />KLM Project MN 3146 <br />Mr. DeBar: <br />As requested during the meeting last Thursday regarding the recommended repairs to the <br />2,000,000 gallon concrete GSR, IuM prepared a revised scope of work along with an <br />updated cost estimate. The following cost estimate is based on a Spring 2014 <br />construction schedule and the use of standard zinc and acrylic or polyurea coatings <br />depending on the location. <br />SCOPE OF WORK - 2014 <br />The following scope of work reflects KLM's professional opinion that it is more cost <br />effective to isolate the primary problem areas by resolving the known issues first, then <br />isolating and dealing with potential secondary issues. What is known is that a) water is <br />infiltrating into the reservoir through the roof, and b) some areas of brick work have and <br />are deteriorating. It is NOT known if the reservoir is leaking, and cannot be larown until <br />the reservoir is isolated and a leakage test is performed, which in turn should not be <br />completed until we can be sure no water infiltrates into the reservoir from the roof. <br />Therefore, rehabilitation work should focus on these areas, with other potential <br />rehabilitation work delayed until these are complete. <br />Brick work can be delayed and should be performed separately, as it does not require an <br />empty reservoir to perform this work. <br />Interior Wet Structural <br />Perform the structural modifications as identified in Sections 3.1.2, 3.1.3, and 3.1.4 of <br />KLM's report. In addition to these, perform the following: <br />Remove the interior caulking and backing rod from the vertical and horizontal <br />construction joints on the exterior wall, and replace with Sika -flex la. There are <br />twelve (12) vertical construction joints, one located at each pilaster, and two (2) <br />horizontal construction joints. <br />
The URL can be used to link to this page
Your browser does not support the video tag.