R <br />ACCEPTING WORK FOR THE 2012 STREET AND UTILITY IMPROVEMENT PROJECT <br />AREA E AND AUTHORIZING FINAL PAYMENT TO NORTHWEST ASPHALT, INC. <br />WHEREAS, the City Council adopted Resolution 7176 on October 22, 2007 <br />establishing the Street and Utility Improvement Program (Program), which includes nine <br />Street and Utility Improvement Projects identified as Areas A through I; and <br />WHEREAS, the City Council authorizedAS gust 8, 2011 Consultingntec Res. Services <br />and c. (for eeng <br />rly <br />Bonestroo) to perform preliminary surveying o <br />design services on September 26, 2011 (Res. 7831) for Area E of the Program, known as <br />2012 Street and Utility Improvement Project — Area E (Project); and <br />ork Twin City Testing Corporation <br />WHEREAS, theeote hnicalnanld environmental ahorized to <br />City l evaluat on for the Project on November <br />perform a preliminary g <br />28, 2011 (Res. 7861); and <br />WHEREAS, the City Council approved a nor, standard street design and parking <br />nd <br />restrictions for Sunnyside Road in the Project on December 12, 2011 (Res. am peals and <br />WHEREAS, the City Council denied Stormwater Infiltration Program app <br />approved the proposed locations of stormwater infiltration basins for the Project on January 9, <br />2012 (Res. 7885); and <br />WHEREAS, the City Council approved bidding documents and authorized the <br />advertisement for bids for the Project on February 27, 2012 (Res. 7905); and <br />WHEREAS, a bid opening was conducted on March 29, 2012 and eight sealed bids <br />were received ranging from $3,392,175.18 to $3,979,383.20 for construction of the Project, <br />with the lowest responsive bid submitted by Northwest Asphalt, Inc. of Shakopee, Minnesota; <br />and <br />WHEREAS, the City Council awarded a contract for $3,392,175.18 to Northwest <br />Asphalt, Inc. on April 9, 2012 for construction of the Project (Res. 7921); and <br />WHEREAS, Northwest Asphalt, Inc. has successfully completed all project <br />construction and met all other contract requirements for the Project with 6the substantial <br />completion date of November 9, 2012 and a final construction cost of $2,936,2 <br />WHEREAS, City staff and its engineering consultant, Stantec, recommend accepting <br />the completed construction work and issuing final payment for $76,394.84 to Northwest <br />Asphalt, Inc. <br />THEREFMREe�Bl <br />Minnesota asRESOLVED <br />by the City Council of the City of Mounds <br />NOW, <br />View, Ramsey County, <br />ntbetween r1Northwest <br />c. for <br />1. lworkimpl the <br />cadUtil y IrnpovementPojectArea Eis hereby <br />construction the ?017 <br />accepted and approved. <br />