Laserfiche WebLink
Item No: 7H <br />Meeting Date: July 14, 2014 <br />Type of Business: Council Business <br />Administrator Review: ____ <br /> <br />City of Mounds View Staff Report <br /> <br /> <br /> <br />To: Honorable Mayor and City Council <br />From: Nick DeBar, Public Works Director <br />Item Title/Subject: Resolution 8281, Authorizing Stantec Consulting Services Inc. to <br />Perform Professional Engineering Design Services and Prepare <br />Bidding Documents for Area H of the Street and Utility Improvement <br />Program <br />Background: <br />The City is in the process of reconstructing 26 miles of City-owned streets and associated <br />underground utilities as part of the Streets and Utilities Improvement Program (Program). The <br />Program includes design standards, a financing plan, a prioritization/implementation (staging) <br />plan, and a communication plan for implementing reconstruction over a 9-year period (2009-2018) <br />with an estimated program cost of $28 million. <br /> <br />The next project area scheduled for construction next year is Area H (see attached Program map). <br />Area H contains 2.4 miles of streets and is located in the north/northwest part of the city and <br />includes Ardan Avenue (Spring Lake Road to Red Oak), Laport Drive, Groveland Road and Court, <br />Knollwood Drive, and Fairchild Avenue. The adjacent properties are predominantly single-family <br />housing. Ardan Avenue and Groveland Road are the non-standard streets in this area due to <br />municipal state aid status and pedestrian/bicycle accommodations. <br /> <br />Discussion: <br />Public Works engineering staff has solicited a fee estimate proposal from Stantec for professional <br />engineering services for Area H as follows: <br /> <br />Design Fee $ 133,300 <br />Bid Fee $ 6,000 <br />Construction Fee $ 180,200 <br />Total Project Fee $ 319,500 (13.3% of $2.4M estimated construction cost for Area H) <br /> <br />Stantec’s fee proposal is based upon a defined scope of work and schedule to accommodate <br />construction in 2015. Stantec (formerly Bonestroo) has successfully performed all engineering <br />services for the design, bid, and construction phases of the Program thus far. In 2011, for Area E, <br />engineering staff solicited competitive fee proposals from another firm that acquired engineering <br />staff from Stantec who were familiar with Mounds View projects and City expectations. However, <br />Stantec’s fee was $30,000+ less than their competitors were, and the City retained Stantec. <br /> <br />Stantec maintains many of the same key personnel that have been integral with the street <br />projects, including design engineers, stormwater engineers, land surveyors, and construction <br />personnel. City engineering staff has developed good working relationships with Stantec <br />personnel and have been extremely satisfied with their performance. <br /> <br />Compensation for Stantec will be on hourly basis plus reimbursable expenses with an estimated <br />maximum fee of $133,300 for the design phase. If approved, staff anticipates that the Council will <br />consider authorizing engineering services for the bid phase after bidding documents are complete <br />and for the construction phase after public bids have been received <br />