My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2014/07/14
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2014
>
Agenda Packets - 2014/07/14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:01 PM
Creation date
6/20/2018 2:29:59 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/14/2014
Supplemental fields
City Council Document Type
City Council Packets
Date
7/14/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No: 7H <br />Meeting Date: July 14, 2014 <br />Type of Business: Council Business <br />Administrator Review: ____ <br /> <br />City of Mounds View Staff Report <br /> <br /> <br /> <br />To: Honorable Mayor and City Council <br />From: Nick DeBar, Public Works Director <br />Item Title/Subject: Resolution 8281, Authorizing Stantec Consulting Services Inc. to <br />Perform Professional Engineering Design Services and Prepare <br />Bidding Documents for Area H of the Street and Utility Improvement <br />Program <br />Background: <br />The City is in the process of reconstructing 26 miles of City-owned streets and associated <br />underground utilities as part of the Streets and Utilities Improvement Program (Program). The <br />Program includes design standards, a financing plan, a prioritization/implementation (staging) <br />plan, and a communication plan for implementing reconstruction over a 9-year period (2009-2018) <br />with an estimated program cost of $28 million. <br /> <br />The next project area scheduled for construction next year is Area H (see attached Program map). <br />Area H contains 2.4 miles of streets and is located in the north/northwest part of the city and <br />includes Ardan Avenue (Spring Lake Road to Red Oak), Laport Drive, Groveland Road and Court, <br />Knollwood Drive, and Fairchild Avenue. The adjacent properties are predominantly single-family <br />housing. Ardan Avenue and Groveland Road are the non-standard streets in this area due to <br />municipal state aid status and pedestrian/bicycle accommodations. <br /> <br />Discussion: <br />Public Works engineering staff has solicited a fee estimate proposal from Stantec for professional <br />engineering services for Area H as follows: <br /> <br />Design Fee $ 133,300 <br />Bid Fee $ 6,000 <br />Construction Fee $ 180,200 <br />Total Project Fee $ 319,500 (13.3% of $2.4M estimated construction cost for Area H) <br /> <br />Stantec’s fee proposal is based upon a defined scope of work and schedule to accommodate <br />construction in 2015. Stantec (formerly Bonestroo) has successfully performed all engineering <br />services for the design, bid, and construction phases of the Program thus far. In 2011, for Area E, <br />engineering staff solicited competitive fee proposals from another firm that acquired engineering <br />staff from Stantec who were familiar with Mounds View projects and City expectations. However, <br />Stantec’s fee was $30,000+ less than their competitors were, and the City retained Stantec. <br /> <br />Stantec maintains many of the same key personnel that have been integral with the street <br />projects, including design engineers, stormwater engineers, land surveyors, and construction <br />personnel. City engineering staff has developed good working relationships with Stantec <br />personnel and have been extremely satisfied with their performance. <br /> <br />Compensation for Stantec will be on hourly basis plus reimbursable expenses with an estimated <br />maximum fee of $133,300 for the design phase. If approved, staff anticipates that the Council will <br />consider authorizing engineering services for the bid phase after bidding documents are complete <br />and for the construction phase after public bids have been received <br />
The URL can be used to link to this page
Your browser does not support the video tag.