My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2014/07/14
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2014
>
Agenda Packets - 2014/07/14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:01 PM
Creation date
6/20/2018 2:29:59 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/14/2014
Supplemental fields
City Council Document Type
City Council Packets
Date
7/14/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Res. 8281, Auth. Stantec to Perform Engr. Design and Prepare Bidding Documents for Area H <br />Page 2 <br />One change for the scope of work in Area H from previous project areas is to evaluate the Area I <br />boulevard areas for suitability to construct infiltration basins. Public Works recommending this <br />change in scope to ensure that the remaining stormwater volumes and areas are achieved to meet <br />RCWD’s requirements for the overall Program. <br /> <br />A geotechnical and environmental evaluation of subsurface conditions is customarily performed for any <br />project with land disturbing activities. These evaluations provide recommendations to be incorporated <br />into the engineering design of pavements, utilities, and infiltration basins. Braun Intertec Corporation <br />provided Public Works a fee proposal of $20,905 for this work, which includes all needed evaluations <br />for the Area I project. This additional scope will assist to determine suitability of infiltration basin <br />locations in Area I. These costs for design will not be needed next year when Area I is authorized to <br />begin the design phase. <br /> <br />Recommendation: <br />Public Works recommends that the City Council adopt the attached resolution authorizing Stantec <br />to perform engineering design services and prepare bidding documents for Area H of the Street <br />and Utility Improvement Program. Doing so will allow the project to stay on course for construction <br />next year. Funding for these services has been budgeted for 2014 under Street Improvement <br />Fund (485-4470-7050) for $247,771. The combined design fees of Stantec and Braun Intertec are <br />$154,205 ($133,300+$20,905) – well below that budgeted. <br /> <br />Respectfully submitted, <br /> <br /> <br /> <br />Nick DeBar - Public Works Director <br /> <br />Attachments: <br /> Resolution 8281 <br /> Street & Utility Improvement Program Map
The URL can be used to link to this page
Your browser does not support the video tag.