Laserfiche WebLink
3. Concrete driveway aprons meeting Public Works Standards at each curb cut <br />serving planned future single-family dwellings in the development. <br /> <br />4. Iron monuments shall be placed under the direction of a Professional Land <br />Surveyor licensed by the State of Minnesota at all lot and block corners and at all other angle <br />points on boundary lines. Monuments shall be installed after all major grading is complete <br />and marked with a fence post in order to preserve the lot markers for use by future property <br />owners. <br /> <br />5. Adjust water service curb stops flush to final grade at property line and inspect to <br />ensure proper operation of valve. Remove any debris from valve box that would interfere <br />with valve operation. <br /> <br />6. Sanitary sewer service pipes shall be exposed at property line and inspected to <br />sewer trunk main by a video recording device. Roots and debris shall be removed and pipe <br />leaks and other deficiencies repaired. Prior to repairing pipe leaks and deficiencies, notify <br />the Director of Public Works of means and methods to repair pipes. Reinspect and video <br />record any repaired pipes and provide Director of Public Works with electronic copies of pre- <br />and post-repair video inspections. Mark sanitary sewer services at property line with 2x4 <br />pressure treated lumber and backfill. <br /> <br />7. Remove all abandoned structures, dead and dying trees, unsightly and invasive <br />vegetation, and all other debris from the development site. <br /> <br />C. General Requirements for Constructing Improvements: The Developer and its agents <br />at Developer’s expense must meet the following requirements during construction of the <br />improvements. <br /> <br />1. Install, maintain, and inspect sediment and erosion control devices in accordance <br />with the Plans, City Standards, and regulatory requirements. Assign qualified person <br />responsible for overseeing site management of sediment and erosion control during <br />construction duration. Provide records of inspection and maintenance to City when <br />requested. Remove all sediment and erosion control devices upon site establishment. <br /> <br />2. All public streets and private driveways shall remain open and unobstructed <br />during construction duration. Traffic control shall be in-place to warn motorists of any <br />hazards. Employ measures to protect street pavement and curbing from damage, including <br />limiting the number of access points from the street to the site. Street pavements and curbs <br />shall be maintained and free of dirt and debris at the end of each day and prior to significant <br />rainfall events. Streets shall be swept within 24 hours after notification by City. The City <br />may perform street sweeping at Developer’s expense in the event that streets are not swept <br />within this time constraint. <br /> <br />3. Haul routes on public streets shall be designated by the Director of Public <br />Works. Developer and its agents must comply with these routes. Failure to comply may <br />result in a stop work order and other enforcement actions. <br /> <br /> <br /> <br />7 <br />