Mounds View City Council July 14, 2014 <br />Regular Meeting Page 8 <br /> <br /> 1 <br />Project Coordinator Stenglein explained a pipe along the east side of Pinewood Elementary was 2 <br />in need of repair. He commented the pipe was originally installed in the mid 90’s. He reviewed 3 <br />several photographs with the Council and indicated the City wanted to have this project 4 <br />completed prior to the start of the school year. Staff reviewed the expense for the project and 5 <br />recommended the Council approve of a construction contract with Dave Perkins Contracting 6 <br />with a 15% contingency for the Pinewood Storm Sewer repair project. 7 <br /> 8 <br />Council Member Meehlhause asked if the storm water projects being deferred in 2014 were 9 <br />critical. Project Coordinator Stenglein explained this was not the case. 10 <br /> 11 <br />Mayor Flaherty questioned ifthe 15% contingency was necessary. Project Coordinator Stenglein 12 <br />explained that additional expenses may be necessary to restore the area and will not be known 13 <br />until after the pipe has been removed. 14 <br /> 15 <br />MOTION/SECOND: Gunn/Hull. To Waive the Reading and Adopt Resolution 8280, 16 <br />Approving Construction Contract with Dave Perkins Contracting, Inc. for the 2014 Belle Lane – 17 <br />Pinewood Storm Sewer Repair Project. 18 <br /> 19 <br />Mayor Flaherty commended staff for maintaining the City’s fund balances through the proposed 20 <br />project. 21 <br /> 22 <br /> Ayes – 5 Nays – 0 Motion carried. 23 <br /> 24 <br />H. Resolution 8281, Authorizing Stantec Consulting Services, Inc. to Perform 25 <br />Professional Engineering Design Services and Prepare Bidding Documents 26 <br />for Area H of the Street and Utility Improvement Program. 27 <br /> 28 <br />Public Works Director DeBar reported Area H of the Street and Utility Improvement Program 29 <br />would be completed in 2015. He commented Arden Avenue and Groveland Road were the two 30 <br />non-standard streets in this area as each had State-Aid status. He indicated staff solicited a bid 31 <br />from Stantec to perform engineering design services. He discussed the efficiencies of using 32 <br />Stantec for this project and noted the expense for Area H would be $319,500, which would cover 33 <br />both design and construction. It was noted that this estimate also included some design work for 34 <br />Area I. 35 <br /> 36 <br />Council Member Mueller was excited that the streets in her neighborhood would finally be 37 <br />completed. She questioned if the property on the west side of Groveland Park would remain a 38 <br />wetland. Public Works Director DeBar commented this was the case and believed stormwater 39 <br />would continue to drain into this area. 40 <br /> 41 <br />Council Member Mueller expressed concern with pedestrian safety with the parking along 42 <br />Groveland Avenue on game days. Public Works Director DeBar explained off-street parking 43 <br />surrounding Groveland Park would be similar to the parking at Hillview Park. 44 <br /> 45