My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2013/11/25
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2013
>
Agenda Packets - 2013/11/25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:15 PM
Creation date
6/26/2018 8:04:45 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/25/2013
Supplemental fields
City Council Document Type
City Council Packets
Date
11/25/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. In addition to this, due to the natural grading, storm water flows from the properties on the <br />north side through the easement on the eastern boundary towards the Ardan Avenue storm <br />water collection system. Since the property on our south side is artificially elevated, the natural <br />flow stops at the south end of our property and collects into our backyard and the low lying <br />areas in adjacent properties. This causes flooding in the backyard (several inches of standing <br />waterfor several days during 3 out of the last 4 years). We had to redo the east half of the yard <br />in 2011. Combined with the high water table and medium permeability (HSG B, as noted in city <br />report) of the soil, this contributes to horizontal seeping of water towards our basement. (see <br />picture 2 below) <br />Picture 2 <br />(Contd...) <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.