Laserfiche WebLink
\Vactewater Infrastructure& Emtioment Maintenance (continued) <br />1,614,551 1,329,283 1,390,137 1,496,868 <br />97 <br />Descri tion <br />2011 <br />2012 <br />2013 <br />2014 <br />Description <br />Metro Waste Commission <br />776,066 <br />760913 <br />816,267 <br />822.568 <br />Estimated animal charge <br />776,066 <br />760,913 <br />816,267 <br />822,568 <br />F3630 <br />Memberships <br />100 <br />50 <br />100 <br />50 <br />100 <br />50 <br />100 <br />50 <br />MN Rural Water Assoc. (50%) <br />Suburban Utility Superintendent Association (SUSA)(50% of$ 100) <br />80 <br />80 <br />80 <br />80 <br />MN Safety Council (20%) <br />230 <br />230 <br />230 <br />230 <br />Training <br />600 <br />560 <br />1,400 <br />560 <br />1,400 <br />560 <br />1,400 <br />560 <br />Collection operators training/mnewal ($350 per person) <br />Tuition reimbursement (PW Mgt. Class - North Hennepin CC) <br />250 <br />250 <br />250 <br />250 <br />Computer haining/webinars <br />120 <br />110 <br />110 <br />110 <br />Hearing tesUR2K (2.15 FTE ° $50) <br />50 <br />- <br />License renewal <br />200 <br />1,200 <br />1,200 <br />1,200 <br />Confined space seminar(on-sitexnot annual) <br />150 <br />- <br />- <br />- <br />Trench safely training <br />450 <br />- <br />- <br />- <br />Wastewater collection operators recertification seminar <br />235 <br />- <br />- <br />- <br />Low voltage license <br />320 <br />320 <br />320 <br />320 <br />Metro School <br />Ho <br />- <br />120 <br />Pesticide applicators license <br />300 <br />300 <br />300 <br />Miscellaneorawastmvatertraining <br />- <br />60 <br />60 <br />60 <br />Maintename Expo <br />- <br />390 <br />390 <br />390 <br />Equipment operator training <br />60 <br />60 <br />Work zone safety Seminar (every 3 years) <br />3,105 <br />4,590 <br />4,590 <br />4,770 <br />4010 <br />Rental, equipment <br />1 000 <br />1,000 <br />1,000 <br />500 <br />Barricades&Signs <br />1,000 <br />1,000 <br />1,000 <br />Soo <br />4800 <br />Insurance <br />7,300 <br />7,300 <br />7,300 <br />7,300 <br />Share ofproperly/liability insurance <br />7,300 <br />7,300 <br />7,300 <br />7,300 <br />5130 <br />Re pairs, equipment <br />100 <br />- <br />- <br />- <br />Fire extinguisher recharge/repair <br />- <br />- <br />Groveland Lift Station repair <br />2,500 <br />2,500 <br />2,500 <br />2,500 <br />Repairs to motors&pumps <br />2,500 <br />2,500 <br />2,500 <br />2,500 <br />Repairs to Vaclor ijet Mick) <br />2,500 <br />2,500 <br />2,500 <br />2,500 <br />Repairs to camera van and camera equipment <br />1,000 <br />1,000 <br />1,000 <br />1,000 <br />Repairs to utility truck <br />250 <br />250 <br />250 <br />250 <br />Misc repairs <br />8,850 <br />8,750 <br />8,750 <br />8,750 <br />5150 <br />Repairs, milities <br />- <br />- <br />- <br />Repairs to RTUs <br />1,000 <br />1,000 <br />2,500 <br />2,500 <br />Lift station repairs <br />),000 <br />1,000 <br />2,500 <br />2,500 <br />5155 <br />Utility servicerepairs <br />4,500 <br />4500 <br />- <br />Service has re pairs <br />4,500 <br />4,500 <br />5160 <br />System maintenance <br />15,000 <br />15,000 <br />15,000 <br />15,000 <br />Sanitary collection system repairs <br />25,000 <br />25,000 <br />25,000 <br />25,000 <br />Root control <br />- <br />15,000 <br />15,000 <br />Contractor restoration ofpavement, bol., etc... <br />2,500 <br />4,500 <br />4,500 <br />Lift station Maintenance/clemaing/pnmp service <br />- <br />- <br />4,000 <br />Sewer debris disposal costs <br />100,000 <br />- <br />Sewer pipe relining program <br />140,000 <br />42,500 <br />59,500 <br />63,500 <br />7030 <br />Capital, equipment > $5000 <br />300000 <br />5,000 <br />- <br />- <br />- <br />- <br />- <br />- <br />Vactor(includes auto chassis lube) <br />GPS Locating Equipment(carryover from 20 10) <br />30,000 <br />30,000 <br />30,000 <br />Generator - trailer mounted (carryover) <br />8,500 <br />- <br />- <br />Wineam sollware upgrade/desktop Iieenschraining <br />- <br />2,750 <br />Electronic rain gauges for SCALA(33%)(total cost $8,250) <br />- <br />- <br />12,000 <br />Grinder station for Bronson lift station <br />2.500 <br />- <br />Vehicle Currents (3) <br />337,500 <br />38,500 <br />30,000 <br />14,750 <br />7050 <br />Construction > S25000 <br />125,000 <br />125,000 <br />250,000 <br />Sewer pipe relining program(carryover from 12,13) <br />125,000 <br />125,000 <br />250,000 <br />7950 <br />Depreciation <br />160000 <br />160,000 <br />160,000 <br />167,000 <br />Estimated depreciation <br />160,000 <br />160,000 <br />160,000 <br />167,000 <br />9100 <br />Contingency <br />15,000 <br />15000 <br />15.000 <br />15,000 <br />Contingency- may include lift station impeller replacement at Bronson <br />15,000 <br />15,000 <br />15,000 <br />15,000 <br />9900 <br />Transfer out <br />160,000 <br />160,000 <br />160,000 <br />140,000 <br />Server system upgrades in conjunction with major roadway program <br />160,000 <br />160,000 <br />160,000 <br />140,000 <br />1,614,551 1,329,283 1,390,137 1,496,868 <br />97 <br />