Laserfiche WebLink
Item No: 7B <br />Meeting Date: June 25, 2012 <br />Type of Business: Council Business <br />Administrator Review: ____ <br /> <br />City of Mounds View Staff Report <br /> <br /> <br /> <br />To: Honorable Mayor and City Council <br />From: Nick DeBar, Public Works Director <br />Item Title/Subject: Resolution 7961, Authorizing Stantec Consulting Services Inc. to <br />Perform Professional Engineering Design Services and Prepare <br />Bidding Documents for Area F of the Street and Utility Improvement <br />Program <br /> <br />Background: <br />The City is in the process of reconstructing 26 miles of City-owned streets and associated <br />underground utilities as part of the Streets and Utilities Improvement Program (Program). The <br />Program includes design standards, a financing plan, a prioritization/implementation (staging) <br />plan, and a communication plan for implementing reconstruction over a 9-year period (2009-2018) <br />with an estimated program cost of $28 million. <br /> <br />The next project area scheduled for construction next year is Area F (see attached map). Area F <br />is primarily single-family housing north of County Road I, and primarily multi-family housing south <br />of County Road I. There are two non-standard streets in this area, Hillview Road and Edgewood <br />Drive, due to municipal state aid status and pedestrian/bicycle accommodations. Area E contains <br />3.0 miles of streets. <br /> <br />Discussion: <br />Public Works engineering staff has solicited a fee proposal from Stantec for professional <br />engineering services for Area F as follows: <br /> <br />Design Fee $ 120,000 <br />Bid Fee $ 4,000 <br />Construction Fee $ 213,000 <br />Total Project Fee $ 337,000 (13% of $2.6M estimated construction cost for Area F) <br /> <br />Stantec’s fee proposal is based upon a defined scope of work and schedule to accommodate <br />construction in 2013. Stantec (formerly Bonestroo) has successfully performed all engineering <br />services for the design, bid, and construction phases of the Program thus far. Last year, for Area <br />E, engineering staff solicited competitive fee proposals from another firm that acquired engineering <br />staff from Stantec who were familiar with Mounds View projects and City expectations. However, <br />Stantec’s fee was $30,000+ less than their competitors were, and the City retained Stantec. <br /> <br />Stantec maintains many of the same key personnel that have been integral with the street <br />projects, including design engineers, stormwater engineers, land surveyors, and construction <br />personnel. City engineering staff has developed good working relationships with Stantec <br />personnel and have been extremely satisfied with their performance. In addition, Stantec’s actual <br />design fee for Area E is $162,000 (through May 11, 2012), which is significantly less than the <br />estimated fee of $275,000 that was authorized last year. <br /> <br />Compensation for Stantec will be on hourly basis plus reimbursable expenses with an estimated <br />maximum fee of $120,000 for the design phase. Staff anticipates that the Council will consider <br />authorizing engineering services for the bid phase after bidding documents are complete and for <br />the construction phase after public bids have been received. <br />