My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2012/09/24
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2012
>
Agenda Packets - 2012/09/24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:09 PM
Creation date
6/26/2018 3:20:53 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
9/24/2012
Supplemental fields
City Council Document Type
City Council Packets
Date
9/24/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View City Council August 13, 2012 <br />Regular Meeting Page 5 <br /> <br />with the equipment replacement at Lambert Park. 1 <br /> 2 <br />Public Works Director DeBar explained he solicited bids on the playground equipment layout 3 <br />prepared by Minnesota/Wisconsin Playground of Golden Valley, Minnesota. The recommended 4 <br />layout would cost $72,744.67, which includes furnishing and installing three playground units, a 5 <br />concrete border, and engineered wood fiber media. The proposed layout was discussed in detail 6 <br />with the Council. 7 <br /> 8 <br />Public Works Director DeBar indicated that Minnesota/Wisconsin Playground was on the 9 <br />national cooperative venture (similar to state cooperative venture) and has furnished and installed 10 <br />previous playground equipment in Mounds View in a satisfactory manner. Staff and the Parks 11 <br />Commission recommended the Council approve the playground equipment replacement at 12 <br />Lambert Park. 13 <br /> 14 <br />Council Member Mueller questioned the color scheme of the playground equipment. Public 15 <br />Works Director DeBar stated Staff was recommending a green and brown color scheme. These 16 <br />colors seemed to resist fading in the long-run and would blend in well with the nearby park 17 <br />shelter. 18 <br /> 19 <br />Council Member Stigney requested the location of the concrete border. Public Works Director 20 <br />DeBar reviewed the location with the Council. 21 <br /> 22 <br />Mayor Flaherty was pleased with the proposed design of the playground equipment. 23 <br /> 24 <br />MOTION/SECOND: Gunn/Stigney. To Waive the Reading and Adopt Resolution 7980, 25 <br />Approving Playground Equipment Replacement at Lambert Park. 26 <br /> 27 <br />Council Member Mueller asked if the quoted price included installation of the playground 28 <br />equipment. Public Works Director DeBar stated the installation was included in the quoted price 29 <br />and the concrete sidewalk around the equipment. 30 <br /> 31 <br />Public Works Director DeBar asked which colors the Council wanted to proceed with on the 32 <br />playground equipment. The Council recommended the brown and green color scheme. 33 <br /> 34 <br /> Ayes – 5 Nays – 0 Motion carried. 35 <br /> 36 <br />8. CONSENT AGENDA 37 <br />A. Resolution 7974, Accepting and Approving the Allocation of the Twin Cities 38 <br />Gateway 2012 Community Festivals and Events Grant. 39 <br />B. Set a Public Hearing for Monday, August 27, 2012 at 7:15 p.m. to Consider a 40 <br />Conditional Use Permit for a Tire and Auto Repair Business at 2832 County 41 <br />Road 10. 42 <br />C. Resolution 7978, Renewal of Training Contract with Century College. 43 <br />D. Resolution 7982, Calling for a Public Hearing by the City Council on the 44 <br />Proposed Modification to the Project Plan for the Mounds View Economic 45
The URL can be used to link to this page
Your browser does not support the video tag.