My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2012/10/22
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2012
>
Agenda Packets - 2012/10/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:37 PM
Creation date
6/26/2018 3:25:18 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/22/2012
Supplemental fields
City Council Document Type
City Council Packets
Date
10/22/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Coventry Senior Living of Mounds View Planned Unit Development <br />Coventry Senior Living of Mounds View PUD Narrative Mounds View Planning Case MU2010-001 <br />Page 2 <br /> <br /> <br />1. PUD Legal Description (proposed) <br /> <br />Coventry Senior Living of Mounds View, Lot 1, Block 1 <br /> <br />2. Zoning: Residential Planned Unit Development – Senior Housing <br /> <br />3. Allowed Use: Senior Housing – Independent Living, Assisted Living, Memory Care, <br />High Acuity Care <br /> <br />4. Site Data: <br /> <br />Total Land Area 2.18 acres <br />Building Footprint 32,892 square feet <br />Pervious Surface Area 40,372 square feet - 42% <br />Impervious Surface Area 54,712 square feet - 58% <br /> <br />5. Dimensional Requirements <br /> <br />Building Setbacks: Front = 30 feet <br />Rear = 20 feet <br />Parking Lot Setbacks: 5 feet <br />Building Height: 3 Stories <br />Parking Requirements: <br /> (a) Independent living = 1 space per unit with half of the spaces enclosed <br /> (b) Assisted living = 0.5 spaces per unit <br />(c) Nursing homes and memory care = 1 space for every 4 beds <br />(d) Facility staff = 1 space for every employee on the largest shift <br /> <br />The proposed project plans show a total of 52 constructed parking spaces – 26 open spaces and <br />26 in the underground garage. Per the PUD City Code, the Developer is required to provide a <br />total of 62 spaces, with 9 of those spaces covered. There are 12 “proof of parking” spaces on <br />the south end of the parking lot, by the garage entrance, making a total number of 64 spaces <br />potentially available. The Developer may not be constructing these spaces with the building to <br />allow more green space for pine trees that will be screening for the adjacent home. The City can <br />require that the Developer or property owner construct some or all of the identified “proof of <br />parking” spaces if the City determines that more parking spaces are needed. The Developer or <br />property owner, upon written notice from the City, shall, within 90 days of said notice (weather <br />permitting), construct some or all of the “proof of parking” stalls as may be required by the City. <br /> <br />6. PUD Review and Construction Process <br /> <br />The Planned Unit Development process is designed to provide for the grouping of land parcels for <br />development as an integrated coordinated unit as opposed to traditional parcel by parcel, <br />piecemeal, sporadic and unplanned approach to development. This is intended to introduce <br />flexibility of site design and architecture for the conservation of land and open space through <br />clustering of buildings and activities through conditional use provisions. It is further intended that <br />planned unit developments are to be characterized by central management, integrated planning and <br />architecture, joint or common use of parking, maintenance of open space and other similar facilities <br />and a harmonious selection and efficient distribution of uses.
The URL can be used to link to this page
Your browser does not support the video tag.