My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2011/02/28
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2011
>
Agenda Packets - 2011/02/28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:39 PM
Creation date
6/26/2018 5:16:49 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/28/2011
Supplemental fields
City Council Document Type
City Council Packets
Date
2/28/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Staff Report Continued <br />Resolution 7745 <br />Item 7C <br /> <br />In addition to the previous items, Staff identified (2) additional options and they are as <br />follows: <br /> <br />Option 1: Patch/Paint/Trim (3) long hallways and add a new chair rail to match existing. <br />Option 2: Paint the metal tables’ bases and chairs/bench frames to complete the new <br />color scheme. <br /> <br />Staff has obtained (2) quotes from contractors for the proposed work. <br /> <br />Contractor Painting Option 1 Option 2 <br />Dick Gripentrog General <br />Contracting <br />$21,905.00 $1,680.00 $905.00 <br />MBB Inc. $45,350.00 $8,550.00 $1,650.00 <br /> <br />NOTE: Should the Council approve the improvements the Community Center will be <br />closed from March 27 through April 2, 2011 to allow the contractor to complete the <br />tasks. (Staff conferred with the YMCA to determine the optimum date to close the <br />building.) <br /> <br />Please see attached map for the floor plan of the Community Center. <br /> <br />Recommendation: <br />Dick Gripentrog General Contracting is the low quote on the base bid and all options. <br /> <br />The 2011 budget includes $7,000 (252-4732-5110) for interior improvements and <br />$25,000 (280-4180-7030) for furniture. The last phase of the re-upholstery is currently <br />in motion and the invoice for this will be approximately $6,000 with $19,000 remaining. <br />Should Council approve these improvements, $19,000 in Special Projects would need <br />to be re-programmed to be used for interior painting. A 5% contingency is <br />recommended to be included in the event that other miscellaneous or unknowns are <br />discovered. <br /> <br />The quote for all of the options is $24,490 and the 5% contingency is rounded to <br />$1,225. The total cost for these improvements would be $25,715 to be funded from <br />account numbers 252-4732-5110 and 280-4180-7030. <br /> <br /> <br />Respectfully submitted, <br /> <br /> <br /> <br /> <br /> <br /> Tracy Juell, Administrative Assistant <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.