My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2011/02/28
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2011
>
Agenda Packets - 2011/02/28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:39 PM
Creation date
6/26/2018 5:16:49 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/28/2011
Supplemental fields
City Council Document Type
City Council Packets
Date
2/28/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />RESOLUTION NO. 7745 <br /> <br />CITY OF MOUNDS VIEW <br />COUNTY OF RAMSEY <br />STATE OF MINNESOTA <br /> <br />APPROVING A CONTRACT WITH DICK GRIPENTROG GENERAL CONTRACTING <br /> FOR INTERIOR PAINTING IMPROVEMENTS AT THE COMMUNITY CENTER <br /> <br /> WHEREAS, the Mounds View Community Center was built in 2 phases during <br />1997 through 1998 has had very minimal improvements or changes to the interior; and <br /> <br /> WHEREAS, the City Council approved reupholstering existing “soft” furniture in <br />the Community Center commons on October 25, 2010 (Res. 7686); and <br /> <br /> WHEREAS, the painting color scheme in the Community Center is outdated and <br />worn, requiring a new paint coating and providing an opportunity to bring a more modern, <br />neutral color scheme to better promote the various spaces to rent; and <br /> <br /> WHEREAS, the following items have been identified and recommended as <br />needed improvements by City Staff and the YMCA Advisory Committee: <br /> <br />• Clean/Paint ceilings and bar joists, including repair of various ductwork wrap <br />along with the “lifting” of ductwork that has fallen through the years. <br />• Remove/Paint/Reinstall multi-colored drop-in panels (grid work) in suspended <br />ceiling areas. <br />• Patch/Paint walls and trim in all of the commons area, conference rooms 1 and 2 <br />and the (2) restrooms located outside of the front counter. <br />• Patch/Paint YMCA office areas behind the front counter and install track lighting <br />at the front counter to replace ineffective lighting currently installed. <br />• Remove the first section of cinder block wall in the commons and patch existing <br />tile. The second section of the wall (beyond the Event Center hallway) is <br />proposed to be lowered to bench height and a wooden seat board installed. <br />• Varnish brick front entry to enhance color of the brick, which will also allow any <br />graffiti to be removed more easily. <br />• Change color of vinyl base where necessary to complete color scheme. <br />• Paint and install a metal coat rack/shelve on both sides of the oval shaped wall. <br /> <br />WHEREAS, Staff also identified (2) additional options: <br />• Option 1: Patch/Paint/Trim (3) long hallways including adding a new chair rail to <br />match existing. <br />• Option 2: Painting the metal bases on the existing tables and frames on the <br />chairs/bench seating to complete the new color scheme; and <br /> <br /> WHEREAS, Staff has obtained (2) quotes from Contractors with the low quote <br />coming from Dick Gripentrog General Contracting in the total amount of $24,490 for all <br />base items above and options 1 and 2; and <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.