My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2011/04/11
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2011
>
Agenda Packets - 2011/04/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:24 PM
Creation date
6/26/2018 5:42:31 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/11/2011
Supplemental fields
City Council Document Type
City Council Packets
Date
4/11/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Nick DeBar File No. 435-09139-0 <br />City of Mounds View April 5, 2011 <br />Area D – Construction Phase Services Page 3 <br />x Preparation of requests for payments within the construction contract. <br />x Preparation and distribution of the notice for the Preconstruction Meeting with the <br />contractor. <br />x Preparation of the agenda for the Preconstruction Meeting with the contractor. <br />x Preparation and distribution of minutes from the Preconstruction Meeting with the <br />contractor. <br />x All activities associated with project invoicing. <br />x Other miscellaneous administrative duties not associated with a specific task under <br />the Construction Phase. <br />¾Deliverable / End Result:Contract quantity record book. Requests for payments <br />to the contractor. Notice, agenda, and minutes from the Preconstruction meeting <br />with the contractor. Project invoices for Bonestroo services. <br />Task 2: Meetings <br />x All meetings attended by Bonestroo personnel, with the exception of internal <br />meetings of the Bonestroo project team. <br />x Meetings included under this Task would include, but not necessarily be limited to, <br />the following: <br />-Neighborhood Preconstruction Meeting for the public. <br />-Preconstruction meeting with the contractor. <br />-Weekly project status meetings. <br />x Immediate preparation in advance of a meeting would be included in this Task. An <br />example would be review of the presentation for the Neighborhood Preconstruction <br />Meeting prior to attendance. <br />x However, preparation of materials for a meeting are not included under this task. <br />For example, if Bonestroo prepared the presentation for the Neighborhood <br />Preconstruction meeting, the time to prepare that document would not be included <br />under this task. <br />x Travel time to meetings would be included under this task. <br />¾Deliverable / End Result:Attendance at meetings. <br />Task 3: Surveying <br />x Construction surveying as described in the Project Manual. (Note: Allowance for this <br />sub-task is $34,750.00 per quote provided to City on March 25, 2011.) <br />x Control surveying as described in the Project Manual. <br />x This Task does not include any activity to provide surveying for private utility <br />improvements (i.e. natural gas, electric, telephone). Any such surveying required for <br />private utilities is beyond the scope of services of this agreement. <br />¾Deliverable / End Result:Control points. Construction stakes. <br />Task 4: Construction Observation & Documentation <br />x Preparatory work by Bonestroo construction management personnel in advance of <br />the start of construction. These activities may include, but not necessarily be limited <br />to, the following: <br />-Site visits to document pre-construction conditions. <br />-Marking removal limits. <br />-Coordination with representatives of private utility companies. <br />-Informal on-site meetings with property owners. <br />x Overall coordination and observation of construction activities.
The URL can be used to link to this page
Your browser does not support the video tag.