My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2011/04/11
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2011
>
Agenda Packets - 2011/04/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:24 PM
Creation date
6/26/2018 5:42:31 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/11/2011
Supplemental fields
City Council Document Type
City Council Packets
Date
4/11/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Nick DeBar File No. 435-09139-0 <br />City of Mounds View April 5, 2011 <br />Area D β Construction Phase Services Page 6 <br />The amount of actual engineering services needed for the Construction Phase can vary based on <br />factors beyond the control of the engineer or the City. These factors can include such things as <br />the number and nature of questions received from property owners and residents, unforeseen <br />conditions encountered during construction, and severe weather. The cost estimate provided <br />above has been based on typical levels of activity for a project of this nature. <br />Compensation Structure <br />A direct hourly compensation structure is being used for all engineering services on the Area D <br />Street and Utility Improvement Project. This was established with the letter agreement for the <br />Design Phase, approved by the City Council on July 12, 2010, and was continued in the Bidding <br />Phase, approved by the City Council on February 28, 2011. It is proposed the compensation <br />structure for the Design Phase and Bidding Phase be continued in the Construction Phase. <br />Until the new Master Service Agreement between the City and Bonestroo is in place, it is <br />necessary to amend the existing Professional Services Agreement in order to use the hourly <br />compensation structure. It is suggested that as part of this letter agreement, Appendix D of the <br />existing Professional Services Agreement be suspended, and be replaced with the following <br />language for the Area D Street and Utility Improvement Project: <br />βThe City shall pay the Engineer for services under the Construction Phase of the <br />project on an hourly basis in accordance with the Billing Rate Schedule shown in <br />Exhibit B attached to this letter.β <br />Exhibit B included with this letter shows the proposed Rate Schedule for the project. It is broken <br />down by classification of the personnel. Within each classification is a range, to allow for <br />differentiation of experience level within a classification category. Included with the Rate <br />Schedule is a listing of the specific rates for several individuals who regularly provide service to <br />the City, as well as others who may be anticipated to work on the project in Area D. It should be <br />noted the rates for the Construction Phase are exactly the same as were used for the Design <br />Phase and Bidding Phase. <br />Schedule β Overview <br />A preliminary schedule for the Area D Street and Utility Improvement Project was prepared in <br />July 2010 at the time City Council authorization was given to proceed with the Design Phase. An <br />updated version of the schedule is shown on Figure 2 included with this letter. The milestones <br />listed in the Design Phase and Bidding Phase were met; therefore the schedule is still correct for <br />the Construction Phase, assuming the City Council awards a construction contract at their <br />meeting of April 11, 2011. <br />The project is on schedule for construction starting in May 2011 with the substantial completion <br />of construction to be achieved by September 30, 2011. <br />Summary <br />Hopefully this provides a sufficient summary of the estimated engineering activities and costs <br />associated with the Construction Phase of the Street and Utility Improvement Project for Area D. <br />If so, it is respectfully requested this information be presented to the City Council at their next <br />meeting for consideration of authorization to proceed with the Construction Phase. We will be <br />present at the meeting to assist in discussion as necessary.
The URL can be used to link to this page
Your browser does not support the video tag.