My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2011/04/11
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2011
>
Agenda Packets - 2011/04/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:24 PM
Creation date
6/26/2018 5:42:31 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/11/2011
Supplemental fields
City Council Document Type
City Council Packets
Date
4/11/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Nick DeBar File No. 435-09139-0 <br />City of Mounds View April 5, 2011 <br />Area D – Construction Phase Services Page 5 <br />Task 6: Record Drawings <br />x Field measurements of constructed improvements necessary for preparing updated <br />record drawings. <br />x Field measurements of infiltration features necessary for calculation of constructed <br />volumes. <br />x Preparation of record drawings. <br />x Transmittal of record drawings to City. Transmittal shall include: <br />-1 set of full size (22”x34”) drawings. <br />-1 set of half size (11”x17”) drawings. <br />-1 set of PDF drawings on disc. <br />¾Deliverable / End Result:Record drawings – full size, half size, PDF. Estimated <br />delivery date for record drawings is March 15, 2012. <br />Task 7: Other <br />x This task shall be used for any activity not covered by the previous tasks defined for <br />the Construction Phase. <br />-Any activity recorded on this task will be reviewed with City Staff to <br />determine whether: <br />The activity warrants creation of a new task. <br />The activity is appropriate to be included in one of the previous <br />defined tasks. <br />The activity should simply be left on this “Other” task. <br />¾Deliverable / End Result:None. <br />Task: Direct Project Expenses <br />x In addition to the labor associated with the performance of the tasks defined above, <br />there will be some amount of direct project expenses incurred during performance of <br />the Construction Phase of the project. Examples of such expenses would include, <br />but not be limited to, mileage, printing costs, and survey equipment. <br />-Direct Project Expenses are reimbursable per the existing Professional <br />Services Agreement between Bonestroo and the City. <br />-Rates for the Direct Project Expenses proposed for this project are <br />shown on Exhibit B included with this letter. <br />Estimated Cost – Construction Phase Engineering Services <br />We have performed an estimate of the anticipated effort necessary to complete the work of the <br />Construction Phase for the Area D Street and Utility Improvement Project. The estimate has <br />been developed based on the preceding discussion of the scope of work, historical information <br />from the projects in Area A and Areas B/C, as well as our understanding of the requirements and <br />expectations of the City of Mounds View. The estimated cost of the engineering services for the <br />Construction Phase of the project is shown below: <br />Area D – Street & Utility Improvement Project <br />Construction Phase Engineering Services <br />Estimated Cost <br />$250,000
The URL can be used to link to this page
Your browser does not support the video tag.