Laserfiche WebLink
2010 ANNUAL REPORT | DEPARTMENT OF PUBLIC WORKS <br />PAGE 5 <br /> 120 Total Coliform Bacteria water samples taken <br /> State samples for Lead and Copper (30 homes) <br /> State samples (fluoride, lead and copper, ccr, bacteria) <br /> Fixed two broken hydrants found during flushing <br /> Fabricated hydrant parts for raising hydrants <br /> Annual Water Quality Report: prepared/mailed <br /> 52 meter repair appointments (sent out 61 repair notice letters) <br /> Quarterly Water Readings (4x annually) <br /> Replaced initial contactor in Well No. 6 <br /> Recharged reaction vessels and reclaim tank <br /> De-Humidifier repair at Well 6 <br /> Replaced sand separator at Well #6 with sand separator from Well #4 <br /> Replaced broken check valve at treatment plant #1 <br /> Shut off 6 water services for internal repairs <br /> 2 residential water tests <br /> 1 hydrant flow test <br /> Replaced battery back up for Bronson Lift Station <br /> Cleared brush from around Treatment Plant #1, Water Tower <br /> Pressure washed, prepped and painted Treatment Plant #1 <br /> Pressure washed Reservoir and Booster Station <br /> Repaired lights on pathway from Silver Lake to County Rd I <br /> Cleaned and sharpened all chain saws <br /> Replaced broken contactor for well #1 air compressor <br /> Verified operation of all valves in area D <br /> Cleaned bone yard area <br /> Fabricated and constructed heating system for back fill storage including storage bin <br /> Wastewater Collection - collect and transport wastewater <br /> 383,000,000 gallons of sewage collected (estimate) <br /> 44+ miles sanitary sewer cleaned/operated <br /> 900+ manholes managed/inspected <br /> Televised sanitary and storm sewer in Area D and E <br /> 2 lift stations operated/maintained <br /> mailed root blockage notices to property owners <br /> Stormwater - collect and treat stormwater runoff, flood protection <br /> 30+ miles storm sewer operated <br /> 1,500+ catch basins/drainage structures operated <br /> 10+ regional stormwater ponds managed <br /> Swept 43+ miles of streets (at least 3 times) <br /> Cleared various storm drain inlet blocks from ice/snow <br /> Attended sediment & erosion control training (certified inspector/installer) <br /> Evaluated street sweeping procedures <br /> Inspect catch basins and storm sewer in Area A for warrantee issues <br /> Inspect/evaluate stormwater infiltration basin performance <br /> Cleaned all City-owned stormwater pond outfalls and control structures <br /> Streets & Trails - manage pavements, snow/ice control, traffic control, street lights <br /> 43+ miles streets total <br /> 15+ miles trails/sidewalks plowed/operated <br /> 1,400+ traffic signs managed <br /> 25 full route snow plowing days <br /> 2,200+ street lane miles plowed <br /> 266 tons salt applied for snow/ice control <br /> 512+ tons asphalt used for street repair, patching, and pothole repairs <br /> 133 mailbox posts fabricated for 398 mailboxes