Laserfiche WebLink
Item No: 7M <br />Meeting Date: May 23, 2011 <br />Type of Business: Council Business <br />Administrator Review: ____ <br /> <br />City of Mounds View Staff Report <br /> <br /> <br /> <br />To: Honorable Mayor and City Council <br />From: Nick DeBar, Public Works Director <br />Item Title/Subject: Resolution 7796, Approving a Construction Contract with Muska <br />Electric Company for the 2011 Electrical Modifications for Well <br />No. 2 Motor Conversion Project <br />Background: <br />Municipal Well No. 2 was constructed in August 1962 and is located within the Public Works <br />Facility at 2466 Bronson Drive. Well No. 2 was powered by a natural gas engine (all other <br />wells have electric motors) and is in the process of begin converted to electric motor power. <br />This conversion was necessary due to the erratic behavior of the 35+ year old used gas <br />engine that was causing the water distribution system to work under a vulnerable state of <br />spiked pressure. <br /> <br />A new 200-HP electric motor was installed as part of the well rehabilitation last year. The <br />remaining work now left to do is associated with electrical modifications to the well house for <br />accommodating the new motor and associated control system. Upon completion, Well No. 2 <br />will be used interchangeably with Well No. 1, each delivering approximately 10% of the City’s’ <br />water supply. Well No. 2 is currently off-line pending completion of the electrical <br />modifications. <br /> <br />Discussion: <br />Last July, the City Council approved the hiring of Bolton & Menk, Inc., an engineering <br />consulting firm, for engineering analysis and plan and specification preparation for the <br />electrical modifications (Res. 7644). The work includes the following: <br />1. Electrical & mechanical demolition, disconnection, and removals; <br />2. Structural demolition, removal, & disposal; repair concrete floor slab & patch walls; <br />3. Furnish & install new magnetic flow meter & associated piping modifications; <br />4. Construct new main electrical service & coordinate with Xcel Energy; <br />5. Furnish & install switchgear, panel boards, circuit breakers, switches, raceways, <br />wiring, & all associated work; <br />6. Furnish & install variable frequency drive & associated work; start-up & training; <br />7. Furnish & install new SCADA panel & antenna; coordinate with vendor. <br /> <br />Request for quotes were sent to five qualified electrical contractors and three quote proposals <br />were received on May 19, 2011. The quotes ranged from $55,400 to $72,450 with the low <br />quote submitted by Muska Electric Company of Roseville, Minnesota. All quotes were below <br />the engineer’s estimate of $75,000. <br /> <br />Bolton & Menk has submitted an hourly fee estimate not to exceed $5,000 to perform <br />engineering services associated with the construction phase. Services include reviewing shop <br />drawings, submittals and O&M manuals; part-time inspection at various stages of the project; <br />provide technical support; perform final inspection and witness start-up; and other <br />miscellaneous and related work. <br />