Laserfiche WebLink
Mounds View City Council April 11, 2011 <br />Regular Meeting Page 5 <br /> <br /> 1 <br />MOTION/SECOND: Gunn/Mueller. To Waive the Reading and Adopt Resolution 7770, 2 <br />Authorizing the Advertisement for the Engineering/GIS Intern. 3 <br /> 4 <br />Mayor Flaherty reiterated that the City was not adding to staff but filling a vacancy. 5 <br /> 6 <br /> Ayes – 5 Nays – 0 Motion carried. 7 <br /> 8 <br />D. Resolution 7771, Awarding a Construction Contract with Northwest Asphalt, 9 <br />Inc. and Authorizing Bonestroo to Provide Engineering Services for the 10 <br />Construction Phase of the 2011 Street and Utility Improvement Project – 11 <br />Area D. 12 <br /> 13 <br />Public Works Director DeBar stated on February 28th the Council approved the plans and 14 <br />specifications for Area D and authorized advertisement of bids. The City received eight bids for 15 <br />the project with the lowest bid being received by Northwest Asphalt from Shakopee. He 16 <br />explained this was the same vendor used for Areas B and C and completed great work on behalf 17 <br />of the City. He indicated that Bonestroo would complete the staking for the project to eliminate 18 <br />any conflict of interest. 19 <br /> 20 <br />Public Works Director DeBar indicated the bidding environment was still favorable and the City 21 <br />was fortunate to complete work for this improvement project. MnDOT has approved the City’s 22 <br />street improvement plans and State funding was available. He then reviewed a letter from the 23 <br />vendor along with a proposal from Bonestroo for engineering services for this project. He 24 <br />anticipated a neighborhood meeting would be held in early May. Staff recommended the Council 25 <br />award the construction contract to Northwest Asphalt and authorize Bonestroo to provide 26 <br />engineering services for the Construction Phase of the 2011 Street and Utility Improvement 27 <br />Project for Area D. 28 <br /> 29 <br />Council Member Mueller questioned what percentage of project costs is Bonestroo’s fee (for 30 <br />construction service). Public Works Director DeBar estimated 11% to 12% of the total 31 <br />construction costs. Fees were lower than in the past as the City has assumed and clarified a 32 <br />portion of the tasks. 33 <br /> 34 <br />Mayor Flaherty requested that Bonestroo provide a better bid for staking as their bid was quite 35 <br />high in relation to the bids received. Joe Rhein, Bonestroo, explained the price included 36 <br />surveying and staking for the entire project based on City standards. He added that the City 37 <br />would see savings overall due to the efficiencies provided by Bonestroo in completing these 38 <br />services through a reduction in inspection services. 39 <br /> 40 <br />Council Member Mueller noted the bid being approved this evening was for bid base one without 41 <br />the alternate. Mr. Rhein indicated this was correct. 42 <br /> 43 <br />MOTION/SECOND: Mueller/Hull. To Waive the Reading and Adopt Resolution 7771, 44 <br />Awarding a Construction Contract with Northwest Asphalt, Inc. and Authorizing Bonestroo to 45