Laserfiche WebLink
<br /> <br />Nick DeBar <br />May 27, 2011 <br />Page 2 <br /> <br /> <br />G:\SMK\Moundsview Contract\Mounds View Pond Inventory.docx <br />Task A---Data Gathering……………………………………………………………………$4,400 <br />• Develop a file of any drawings and other information the City may have on the basin <br />(Performed by the City) <br />• Determine the immediate drainage area and the total tributary area to the basin (Performed by <br />Barr) <br />• Perform a bathymetric elevation survey of the basin. The survey information collected will be <br />limited to the minimum amount of survey shots needed to determine a reasonably accurate <br />bathymetric map of the basin bottom in order to estimate the basin’s volume (Performed by <br />Barr) <br />• Determine historic wetland status for the site by obtaining and reviewing NWI, soils <br />maps/data and historic aerial photos in the area of the basin that were prepared/taken prior to <br />the time it was constructed or storm sewers were constructed to discharge into it. (Performed <br />by Barr) <br />• Take photos and measurements of the basin’s outlet structure and photograph other in-basin <br />structures if any (Performed by Barr) <br />Task B--- Basin Maintenance Computations and Prioritization……………………...$2,550 <br />• Prepare a an existing conditions contour drawing for the basin (Performed by Barr) <br />• Estimate the volume of sediment to be removed from the basin based on a) if the basin or <br />parts of it was a wetland prior to its construction (proposed excavation can only be as deep as <br />the top of the remaining original wetland material), b) records of how deep the basin was <br />originally constructed or c) excavation needed to optimize the basin’s performance per <br />Minnesota Stormwater Manual criteria (Performed by Barr) <br />• Prepare opinions of cost for a) excavation and disposal/reuse of dredged sediment, b) <br />structure modifications that may be needed to improve basin performance (Performed by <br />Barr) <br />• Prepare an estimate of the anticipated percent removal of total suspended soils and total <br />phosphorous that the basin may be able remove, base d on the size of the basin (relative to its <br />total drainage area) for existing and proposed conditions (Performed by Barr) <br />Task C--- Basin Maintenance Summary Report……………..….$3,000 <br />• Prepare a report summarizing the work performed, analysis findings, projected basin <br />efficiencies (current and future), maintenance costs, and recommended actions based on the <br />work described above. Barr will provide the City two hard copies and an electronic PDF of <br />the project report <br />• Present the report to the City staff (Performed by Barr) <br />Please note that in each task the design and management of any dredging or other construction work <br />is not included in our estimated costs, as it is not yet known what work will be needed.