Laserfiche WebLink
2011 Q3 Report | Public Works Department <br />Page 2 <br /> Brought hydrant nozzle sections to Central Sandblasting for blasting, priming, & painting (in- <br />house) <br /> Raised hydrants to proper height and fabricated hydrant parts for raising hydrants <br /> Meter repair appointments (sent out 61 repair notice letters) <br /> Shut off water services for internal repairs <br /> Residential water tests <br /> Hydrant flow test <br /> Cleared brush from around Treatment Plant #1 <br /> Repaired lights on pathway from Silver Lake to County Rd I <br /> Cleaned and sharpened all chain saws <br /> Replaced broken contactor for well #1 air compressor <br /> Verified operation of all valves in Area E <br /> Cleaned bone yard area <br /> Wastewater Collection - collect and transport wastewater <br /> Cleaned 13.1 miles sanitary sewer <br /> Mailed root blockage notices to property owners <br /> 2 lift stations operated/maintained <br /> Televised problem sanitary sewer locations and re-televised some sewers in Area E <br /> Stormwater - collect and treat stormwater runoff, flood protection <br /> Cleared various storm drain inlet blocks from ice/snow <br /> Swept 43+ miles of streets <br /> Inspect catch basins and storm sewer in Area B/C for warrantee issues <br /> Inspect/evaluate stormwater infiltration basin performance <br /> Cleaned all City-owned stormwater pond outfalls and control structures <br /> Streets & Trails - manage pavements, snow/ice control, traffic control, street lights <br /> street repair/patching <br /> Mailbox post construction for Area D <br /> Repair and replace street signs <br /> Parks & Park Facilities - maintain park land, shelters, amenities, athletic/recreation facilities <br /> 5 park buildings/shelters operated/maintained <br /> General building and grounds maintenance. <br /> Drag ball fields and warning tracks. <br /> Mowing and mulching at all 10 parks and City owned green space (145 acres). <br /> Some preventative weed control. <br /> Soccer fields layout and painting. <br /> Irrigation repairs. <br /> Sweeping trail ways and sidewalks (multiple occurrences) <br /> Aeration of all athletic field playing surfaces. <br /> Fertilizing parks and common areas, any turf areas. <br /> Disc golf hole # 7 relocation. This was done to preserve a Bur Oak Grove. <br /> Leaf pickup at all parks and city green space. <br /> Drinking fountain shutoff and valve removal. <br /> Light bulb inventory. <br /> Start looking at mower’s and other field maintenance equipment for needed maintenance and <br />parts replacement. <br /> Working on plans for Lambert Park facelift and shelter replacement. <br /> Planted saplings along pathways and sidewalks with Forester. <br /> Watered younger trees with tanker periodically because of drought conditions <br /> Branch pickup after high wind events and anytime Forester did trimming in parks or boulevards <br />(multiple times) <br /> Buildings & Grounds – maintain and repair buildings and grounds <br /> maintained 100,000+ sq. ft. buildings