My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1997/04/07
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1997
>
Agenda Packets - 1997/04/07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:18 PM
Creation date
6/28/2018 1:40:35 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/7/1997
Supplemental fields
City Council Document Type
City Council Packets
Date
4/7/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Mounds View <br /> • Mr. Mike Ulrich <br /> March 28, 1997 <br /> Page 2 <br /> The following is an outline of the Basic Services proposed: <br /> • <br /> Building Mechanical Systems Evaluation: <br /> 1. Perform a site visit to review the building mechanical systems including the following: <br /> Inventory existing building mechanical equipment. <br /> Map out locations of existing mechanical equipment. <br /> Review operation sequence of mechanical systems. <br /> - Observe condition of building mechanical systems and equipment. <br /> 2. Prepare Report for building including the following: <br /> A. Summary of building mechanical equipment and systems. <br /> • - Identify system type, size and approximate age of components. <br /> Identify sequence of operation. <br /> - Prepare statement of condition and remaining useful life. <br /> - Identify failed system components or those not working properly. <br /> - Estimate cost to replace system with same type. <br /> B. Table of existing mechanical equipment manufacturer and model numbers, age, useful <br /> life, condition and approximate replacement cost. <br /> C. Prepare single line sketch of building with approximate locations of mechanical <br /> equipment indicated. <br /> D. Prepare table of recent energy usage and costs. <br /> E. Analysis of alterative systems determined as relevant during study: <br /> - Estimated energy savings (if applicable). <br /> - Pros and cons of alternate system compared with existing system. <br /> - Estimated construction cost. <br /> - Estimated payback. <br /> - Potential rebate sources and amounts. <br /> 1111 <br /> F. Summary of recommendations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.