My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1997/04/07
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1997
>
Agenda Packets - 1997/04/07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:18 PM
Creation date
6/28/2018 1:40:35 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/7/1997
Supplemental fields
City Council Document Type
City Council Packets
Date
4/7/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Mounds View <br /> Mr. Mike Ulrich • <br /> March 28, 1997 <br /> Page 3 <br /> Individual Space Environment Evaluation: <br /> 1. Perform a site visit and a room by room analysis to review any perceived environmental <br /> deficiencies. <br /> 2. Perform heating/cooling load calculations to determine the quantity of heating and cooing <br /> needed for each space and compare that with the amount of heating or cooling that it ctn?i.l r <br /> being delivered. <br /> 3. Investigation to determine sources of noise and temperature variations. <br /> 4. Prepare Report for building including the following: <br /> A. Summary of space environmental conditions. <br /> - Identify calculated heating and cooling loads for each space. <br /> - Identify actual heating and cooling being delivered to each space. • <br /> - Identify required and actual ventilation air delivered to each space. <br /> - Identify sources of observed noise. <br /> B. Recommend solutions to correct deficiencies and/or problems and estimated construction <br /> costs. <br /> Temperature Controls/Energy Management System: <br /> 1. Perform a site visit to review the building mechanical control devices including the following: <br /> Inventory existing building mechanical control devices. <br /> Observe condition of building mechanical control devices and equipment. <br /> 2. Prepare Report for building control systems including the following: <br /> A. Summary of building mechanical control systems. <br /> - Identify system type, size and approximate age of components. <br /> - Prepare statement of condition and remaining useful life. <br /> - Identify failed system components or those not working properly. <br /> - Estimate cost to replace system with same type; using an alternative system. • <br />
The URL can be used to link to this page
Your browser does not support the video tag.