Laserfiche WebLink
• f <br /> City of Mounds View <br /> • Mr. Mike Ulrich <br /> March 28, 1997 <br /> Page 4 <br /> B. Analysis of alterative Energy Management Systems determined as relevant during study: <br /> - Level of sophistication. <br /> - Pros and cons of alternate system compared with existing system. <br /> - Estimated construction cost of each level of Energy Management System. <br /> Wentz Associates, Inc. proposes to provide the described services on an houzly not-to-exceed <br /> basis: <br /> N.T.E. <br /> Fees <br /> City Hall/Administration Building: <br /> Mechanical Systems Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Space Environment Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . $3f00 <br /> Control Systems EMS Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . $1850 <br /> • It should be noted that performing the Space Environment Evaluation will lead to a better <br /> determination of the sizes of mechanical systems needed. <br /> Engineering services are billed monthly. The above amounts exclude outside costs such as printing, <br /> mileage, postage and messenger service, which will be billed at cost. <br /> We propose to retain the services of Pneumatic Controls Inc. to assist in analyzing the existing <br /> temperature control devices. Their services will be billed as an outside reimbursable expense at cost. <br /> It is estimated that these services will cost approximately $1,000.00. <br /> Construction documents for incorporating recommendations are not included at this time but could <br /> be provided in the future,if and when the scope of work is determined from decisions resulting from <br /> the evaluations. <br /> Thank you for the opportunity to present this proposal. If you have any questions, comments or <br /> revisions, please feel free to call. <br /> Sincere <br /> Com . <br /> • Thomas Wentz, P.E. <br /> WENTZ ASSOCIATES, INC. <br />