Laserfiche WebLink
City of Mounds View Staff Report <br /> Planning Case No.477-97:D.W.Jones Property <br /> May 24, 1997 <br /> Page 4 <br /> Underground parking for senior citizen apartment building: There have been questions raised <br /> whether underground parking for the senior building will work with the water table. On May <br /> 13, 1997,the applicants performed a soil pit investigation to determine the elevation of the <br /> water table where the proposed senior building would be located. Accompanying the <br /> applicants was Wayne Jacobsen, a soil scientist with SEH. Two holes were dug and ground <br /> water was not encountered until a depth of 13 feet was reached. This translates into an <br /> elevation of approximately 897. From this investigation then,it appears that underground <br /> parking for the senior building could be possible, contingent on review by the City Engineer <br /> once a minimum building elevation for the garage had been established. <br /> 17 Site design. Design theme along Highway 10: Staff contacted Todd Rhoades,with Cermak and <br /> Rhoades,to do a design critique of the general concept plan and to make suggestions on site <br /> layout. Several different alternative layouts were suggested, using different combinations of <br /> uses on the site. These sketches have been further refined and will be presented at the May 27 <br /> City Council meeting. <br /> Staff would suggest the following design principles be incorporated into the PUD stipulations: <br /> • The corner at Silver Lake Road and Highway 10 shall be treated as a gateway to the <br /> Mounds View Village Center. A specific design plan for this area shall be submitted at <br /> the time of development plan review,which could include such improvements as a low <br /> wall with signage announcing the Mounds View Village Center, a rich palette of <br /> • <br /> landscaping with trees, shrubs and flowers, and special lighting and fencing which <br /> would also be used to establish a design theme along Highway 10. <br /> • Materials used in the corner development for the buildings,the pillars used to support <br /> the gas station canopy and for the sign supports shall be of high quality,masonry <br /> construction, with architectural detailing and a unifying color scheme carried <br /> throughout. <br /> • The sit-down restaurant be grouped with the two office buildings and a"parking court" <br /> be created between these uses and the gas station/convenience market on the corner. <br /> The service drive shall follow the perimeter of the parking court to ease the curves <br /> which must be navigated by service vehicles. <br /> • A walkway connection be created between the senior citizen housing project,the <br /> restaurant and the office buildings. Pedestrian circulation be considered in the design <br /> of the gas station/convenience market site. <br /> • Effort should be made to create a driveway connection between TJB Homes and the <br /> development to the north and to the south to provide motorists a way to get between <br /> uses without having to go out onto Highway 10. <br /> Appropriateness of the Uses: As discussed at the April 28, 1997 Council meeting,the proposal for a <br /> mixed use PUD is consistent with the Comprehensive Plan. The Highway 10/Area 9 Redevelopment <br /> Report prepared by SRF Consulting and presented to the City Council on April 7, 1997 suggested that <br /> a PUD approach to development of this site would be the preferred option. The alternative suggested <br />