Laserfiche WebLink
City of Mounds View Staff Report <br /> Planning Case No.477-97:D.W.Jones Property <br /> May 24, 1997 <br /> 111) Page 3 <br /> SEH does not expect stacking on Silver Lake Road--both northbound and southbound--to be a <br /> problem. Stacking on the northbound side may affect access to Driveway D for southbound <br /> motorists who want to turn left into the gas station site. Stacking is not expected to block the <br /> service road, and therefore motorists have an alternative. Also, since Silver Lake Road is four <br /> lanes wide at this point,motorists who want to travel south will have a way to get around <br /> motorists waiting to turn left into Driveway D or the service road. The revised traffic volumes <br /> submitted by Biko are consistent with SEH's calculations. SEH has noted that conflict points <br /> on-site continue to be a concern, caused by having the entrance to the two drive-thru aisles just <br /> after motorists enter the site at Driveway D,the need to cross Driveway D to go from the gas <br /> pumps to the drive-thru aisles, and the driveway from the service road which cuts across the car <br /> wash stacking lane. Staff has discussed with the applicant the possibility of dropping the drive <br /> thru aisle for the fast food restaurant and they are willing to consider it. This issue is noted in <br /> the stipulations and would be resolved at the development plan review. <br /> Q Drainage system: The site plan indicates two NURP ponds to handle the predicted run-off from <br /> this development. Rocky Keehn with SEH Inc. has reviewed the drainage calculations and the <br /> proposed ponding and has made a number of conclusions in a memorandum dated May 22, <br /> 1997 (attached). First,the NURP pond located at the southeast corner of the site(the east <br /> pond)is not feasible because the wetland extends out toward Highway 10, separating the pond <br /> from the development. While it would be possible to convey the water to the proposed pond <br /> via ditches or piping parallel to Highway 10,this would entail an alteration to the wetland itself <br /> and approval from regulatory agencies. <br /> • <br /> A further complication arises in that there is an existing stormwater intake culvert running <br /> under Highway 10 that carries discharge from approximately 26 acres north of the <br /> development. Use of the Highway 10 drainage ditch to convey runoff from the development to <br /> the proposed NURP pond would require the NURP pond to be sized large enough to <br /> accommodate both the development and the additional 26 acres of runoff. These factors <br /> contribute to the east pond's lack of feasibility. The second NURP pond--the central pond-- <br /> between the senior building and restaurant, while properly located, appears to be too small to <br /> handle the runoff directed to it. There appears to be sufficient room,however,to expand the <br /> pond as needed. A pond is likely needed to handle the runoff from the senior building and its <br /> parking lot, and the most likely location is south of the senior building where the nature <br /> overlook is shown. <br /> The remaining issue then is accommodating the runoff from the proposed office building south <br /> of TJB Homes, which could be accomplished with a small pond or grassed swale immediately <br /> adjacent to the office building and its parking area. Staff feels that the size of the office <br /> building would have to be reduced in order to provide for the necessary ponding. This issue <br /> has been discussed with the applicant, and they are willing to consider reducing the building <br /> from 5,000 square feet to 4,000 square feet. This would reduce the impervious area by at least <br /> 1,740 square feet and perhaps more, depending on building configuration and whether a <br /> driveway connection is made to TJB Homes. Staff has changed the maximum building area for <br /> the office building at the south end of the site to 4,000 square feet in the PUD stipulations. The <br /> • final layout of this site and the density allowed would be addressed in the development plan <br /> review. <br />