Laserfiche WebLink
Pamela Sheldon <br /> May 22, 1997 <br /> Page No. 4 • <br /> development that occurred at the Senior Center to the south(where the system outlet is located) and <br /> that which is proposed on this site. <br /> Conclusions: <br /> 1. The calculation supplied by the developer for determination of highwater in the wetland area <br /> is incorrect,but can be modified at later date. <br /> 2. The proposed land use is consistent with that proposed in the LWMP. <br /> 3. The highwater elevation for the site in the LWMP is 906.2 with a minimum building elevation <br /> of 908.2. <br /> 4. On-site detention pond is not required since this is a regional pond modeled as part of a larger <br /> drainage system. <br /> If you have any questions, please call me at 490-2026. <br /> RJK/sh <br /> F:\pRoJEcTswOUND\9701\MEMOS\SHELDON.522 <br /> • <br /> • <br />