My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1997/07/07
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1997
>
Agenda Packets - 1997/07/07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:50 PM
Creation date
6/29/2018 5:11:51 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/7/1997
Supplemental fields
City Council Document Type
City Council Packets
Date
7/7/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
to employees may be between cost and retail. Policies and discounts for league play will be <br /> presented in the budget. The percentage of lessons paid to the golf pro(s)will be excluded from <br /> gross revenues and payroll costs. <br /> IIIPayroll costs will include all salaries and benefits paid to golf course employees. Benefits <br /> include but are not limited to social security, medicare, retirement, health, life, and dental <br /> insurance, unemployment and workers' compensation insurance and claims, specialized golf <br /> course training and seminars provided however, general training provided to all city employees <br /> and other training that will benefit other city departments may be excluded at the discretion of <br /> the City Administrator. The City will not charge the golf course for incidental services provided <br /> to the golf course by other City personnel nor will there be a reduction in golf course personnel <br /> costs for incidental work provided to other city operations by golf course personnel. <br /> The contract will include a requirement that the course and equipment be maintained at <br /> preestablished minimum standards. As part of this contract, the cost of personnel will include <br /> the cost to grind the reels/blades on the equipment; the City will provide the grinder necessary <br /> for this work. At most courses, this is contracted out at a cost of approximately $9,000 per year. <br /> A capital budget will be presented during the budget process and the City will pledge to replace <br /> equipment worn out by normal use. As part of the proposed contract, golf course personnel will <br /> undertake several improvement projects per year such as planting additional trees, shrubs and <br /> flowers, reconstructing tees and/or greens, constructing new facilities such as this year's picnic <br /> area and chipping green. These projects will be presented during the budget process and are <br /> estimated to take approximately 400 hours of time. <br /> 110 Attached is selected information from the 1995 National Golf Foundation's Operating and <br /> Financial Performance Profiles of 9 hole Public Golf Facilities in the United States. In addition, <br /> I have prepared a schedule comparing this information to our facility. As noted on the schedule, <br /> detailed information is obtained independently from the overall information; as such, I adjusted <br /> the detailed information in order that the detail would agree to the totals (see schedule for method <br /> of adjustment). Overall, our course is in the top 5% of Frost Belt courses for rounds of golf <br /> played and total revenues. Based upon the detailed information, payroll costs were 44% of gross <br /> revenues; as I adjusted the detail to equal the total expenses, it was 40.75%. It should be noted <br /> that the greater the number of rounds played and the earlier in the year the course is opened,the <br /> greater the maintenance and personnel costs. The noted 40.75% figure was an average of the top <br /> 25 and 5% of courses and as such, is probably on the low side. The top 5% of frost belt golf <br /> courses have club houses that average 10,000 square feet verses our 1,800; the larger area <br /> increases their ability to sell more merchandise with little additional overhead since they already <br /> staff the club house for taking reservations, renting carts, etc. <br /> It is proposed that the City enter into a contract with its current superintendent at a base salary of <br /> $40,000 per year under the terms outlined above. Under the contract, total payroll costs would <br /> equal 44% of revenues (40.75%of top 5% of frost belt courses plus .50% for the restricted area <br /> for merchandising plus 1.25% for added maintenance on equipment plus 1.50% for correction of <br /> original design and construction problems and yearly course construction enhancements, for a <br /> • total of 44% of gross revenues). It is proposed that the contract be effective for 1997 through <br /> 2001. If the arrangement was working satisfactorily, it would be proposed to structure future <br />
The URL can be used to link to this page
Your browser does not support the video tag.