My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1997/07/28
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1997
>
Agenda Packets - 1997/07/28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:15 PM
Creation date
6/29/2018 5:31:20 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/28/1997
Supplemental fields
City Council Document Type
City Council Packets
Date
7/28/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BKPV <br /> June 5, 1997 <br /> Ms. Pam Sheldon <br /> City of Mounds View <br /> 2401 Highway 10 <br /> Mounds View, MN 55112 <br /> Dear Pam, <br /> Enclosed are 12 copies of revised and additional plans for MSP's Silver Lake Commons project. <br /> .Arcn,cec'.ure Survey(with 2 full sized copies) <br /> Site Plan <br /> nrerior Design Landscape Plan <br /> Drainage Plan with calculations <br /> Three bedroom floor plan <br /> 1-vnee-Ing Four bedroom floor plan <br /> • The Landscape Plan shows the existing trees that we feel can be saved--these include a grouping <br /> of cottonwoods and elm at the site entry and many of the oak and pine trees in the play area. We <br /> have shown overstory,ornamental and screen plantings on the plan, and have shown areas to be <br /> sodded around the buildings and the larger play area to be seeded. We will include additional <br /> foundation plantings around the buildings in the final landscape plan to be submitted for <br /> permitting. <br /> The Drainage Plan shows the existing drainage pattern on the existing site will be maintained—the <br /> site slopes from north to south with part of the flow being diverted west of the 23 unit building <br /> and part of it draining at the existing driveway. All existing water drains directly into the ditch in <br /> Highway 10. We are not significantly changing the pervious/impervious surfaces for the existing <br /> development. Paramount Engineering has calculated the additional runoff from the new <br /> development on the east portion of the site. This runoff will be captured in the ponding area at the <br /> southeast corner of the site. The pond will be sized for.2 AF of storage for water quality <br /> treatment and an additional.31 AF for a 100 year event. The .2 AF will be contained in the <br /> ponding area southeast of the 6-unit building while the ponding area for the 100 event will extend <br /> north of the building and possibly over the drive area south of the building(as shown by the <br /> dotted lines). The ponding area will be piped to drain into the ditch to flow west to the existing <br /> I 5" pipe under Highway 10. Please call Bob Weigert at Paramount at 771 0544 if you have <br /> additional questions on the drainage issues. <br /> Please call me if you have questions or require additional information. <br /> ooi`r Sincere y, <br /> 11111,:.3:9 <br /> P-terJ. Pfister,AIA <br /> _ = c Jeff Huggett,MSP <br /> Bob Weigert, Paramount mspjo5 <br /> IA <br />
The URL can be used to link to this page
Your browser does not support the video tag.