Laserfiche WebLink
ORDINANCE NO. 600 <br /> CITY OF MOUNDS VIEW <br /> COUNTY OF RAMSEY <br /> STATE OF MINNESOTA <br /> AN ORDINANCE AMENDING CHAPTER 202, SECTION 202 . 09 OF THE <br /> MOUNDS VIEW MUNICIPAL CODE VIEW ENTITLED "PUBLIC IMPROVEMENTS" <br /> The City of Mounds View ordains : <br /> SECTION I Chapter 202 . 09, Subd 2 of the Mounds View <br /> Municipal Code is amended to read: <br /> Subd.2 Improvement Type and Apportionment of Cost: <br /> a. Street Reconstruction Including Curb and Gutter. <br /> The cost of street reconstruction shall be recovered by <br /> the adjusted front footage method. The front footage <br /> rate shall be determined by dividing the project cost by <br /> the total number of adjusted front feet in the project <br /> area x the individual adjusted front footage x one-half <br /> (1A) . The assessments per adjusted front foot may vary <br /> depending on the underlying zoning of a parcel . <br /> Assessments for residential properties which are on <br /> collector or arterial streets shall be adjusted so that <br /> the amount of the assessment shall be the same as if the <br /> project were constructed to residential street standards . <br /> The remaining cost shall be recovered by means of the <br /> general ad valorem property tax paid by the entire <br /> community or by other funds that may become available to <br /> the City for infrastructure cost recovery. <br /> b. Street Resurfacing. Street resurfacing is commonly <br /> known and referred to as street overlaying whereby a new <br /> bed of road material such as bituminous is installed over <br /> an existing paved road to a specific thickness . <br /> Assessments shall be determined by the adjusted front <br /> footage method. <br /> c. Sidewalk. Sidewalk improvements may. be done in <br /> conjunction with a street reconstruction or as a separate <br /> project. In any event, cost of sidewalk improvements <br /> shall be recovered by means of the general ad valorem <br /> property tax paid by the entire community or by other <br /> funds that may become available to the City for <br /> infrastructure cost recovery. • <br />