My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1997/12/03
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1997
>
Agenda Packets - 1997/12/03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:24 PM
Creation date
6/29/2018 7:26:26 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
12/3/1997
Supplemental fields
City Council Document Type
City Council Packets
Date
12/3/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
612 223 5370 P. 01 <br /> • WA! <br /> Contint.itin • <br /> ARCHITECTURAL DESIGN <br /> MEMORANDUM PROJECT MANAGEMENT <br /> CONSTRUCTION SERVICES <br /> MASTER PUNNING <br /> TO: Cathy Bennett INTERIOR DESIGN <br /> City of Mounds View <br /> FROM: Dean A. Olsen <br /> WAUContinuum <br /> DATE: November 21, 1997 <br /> RE: Mounds View Community Center <br /> Phase 2 <br /> #90634 <br /> Fax Transmittal <br /> As a follow-up to our phone conversation on Tuesday,November 18, 1997 with respect to <br /> Phase 2 at the above referenced facility the following should be noted: <br /> - The existing roof at the facility is leaking and it was decided to replace the roof in conjunction • <br /> with the Phase 2 construction. The construction probable cost estimate for Phase 2 does not <br /> include a price for the reroofing of the existing facility. Please advise as to whether this will be <br /> an additional cost to the project, or if the cost is to come out of the budget for Phase 2, thus <br /> reducing the actual Phase 2 construction cost. Estimated roof cost is approximately <br /> S105,000.00. <br /> - A request by the Public Works department for a heated sidewalk has been discussed. The <br /> approximate cost would be S10-12 a square foot for an electrical system, to S25 a square foot <br /> for a hydronic system. The electrical system is not recommended. Estimated cost for the <br /> walkway at the main entry only is approximately $25,000.00. <br /> - Per the project management cost spreadsheets the equipment for the gym is to be provided by <br /> the City (i.e. bleachers, basketball backboards, etc.). Please advise to the equipment that the <br /> City wishes to use, or if WAI/C should select models that the plans and specifications will be <br /> based on. <br /> - Specifications or equipment 'cut sheets' need to be provided for any additional equipment or <br /> accessories that the City wishes to provide for the project. <br /> Please advise as to the direction you want us to proceed. <br /> Should you require any additional information or assistance with this matter, please contact me. <br /> 381 East Kellogg Blvd. <br /> 5t.Paul.Minnesota 55101 • <br /> Fax 612.223-5092 <br /> P'690634'CORRESP M!MOIY.DAO <br /> 612-22/0o44 <br /> WIscon„n Omce <br /> 2125 Altoona Avenue <br /> Eau Claire.Wisconsin 54701 <br /> MN and WI 1-800.8450784 <br />
The URL can be used to link to this page
Your browser does not support the video tag.