My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1996/03/25
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1996
>
Agenda Packets - 1996/03/25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:04 PM
Creation date
6/29/2018 9:30:51 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
3/25/1996
Supplemental fields
City Council Document Type
City Council Packets
Date
3/25/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR COUNCIL CONSIDERATION Agenda Section 11_F_ <br /> STAFF REPORT Report Number: 9 6-1 64:1i; <br /> Report Date: 3/21/96 <br /> CITY COUNCIL MEETING DATE <br /> March 25, 1996 Special Order of Bus. <br /> Pasioe• _ Consent Agenda <br /> _ Public Hearings <br /> X Council Business <br /> Item Description: Consideration of Surface Water Pond Abandonment, Long Lake Road & TH10 <br /> Administrator's Review/Recommendation: , <br /> -No Comments to supplement this report X (! <br /> -Comments attached. <br /> Explanation/Summary(attach supplement sheets as necessary) <br /> Summary: Staff presented a proposal to Council at the March 4, 1996 work session explaining the <br /> possibility of abandoning the surface water pond at the intersection of Long Lake Road and TH 10 for the <br /> purpose of constructing the pedestrian bridge. Staff was directed to consult with the City's engineer for an <br /> estimate of the cost pertaining to the filling of the pond and subsequent storm sewer pipe construction. Staff <br /> spoke with Steve Campbell regarding this matter. Steve explained that any estimates given at this time, prior <br /> to surveying, computer modeling, and negotiations with the agencies involved, would be extremely <br /> conservative. Cost estimates for the construction portion of the project are as follows: <br /> Storm Sewer Revisions(A) $5,000 - $10,000 <br /> Fill Existing Pond $5,000 - $ 7.500 <br /> Subtotal $10,000 - $17,500 <br /> Construct Mitigation Pond(B) $10,000 - $15,000 <br /> Total Est $20,000 - $32,500 <br /> (A) Assumes that the existing storm sewer along the west boulevard of Long Lake Road is high enough to be <br /> relieved by the existing system under long Lake Road and parallel to STH 10. This will be verified by the field <br /> surveys. <br /> (B) I required by regulatory agencies. To be located on City property south of Public Works Facility. <br /> The two proposals received for this study were from BRW Inc. for $7,620 and SEH for $6,900. <br /> Staff met with Paster Enterprises on Tuesday, March 19, 1996 to discuss issues regarding the preferred bridge <br /> design. Mr. Paster requested several items of information from staff regarding traffic counts on Hwy 10 and <br /> any pedestrian patterns in the area. Staff would request that this item be tabled until the April 1 Council <br /> work session for further discussion. <br /> Accompaning this report is the Pedestrian Bridge Work -an requested at the March 4, 1996 work session. <br /> 4/11RECOMMENDATION: Michael Ulrich, Director of Public Works <br /> Table this issue until the April 1 Council work session, at which time more information will be available. <br />
The URL can be used to link to this page
Your browser does not support the video tag.