My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-25-1994 CC
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1994
>
07-25-1994 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:10 PM
Creation date
7/2/2018 7:52:33 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/25/1994
Supplemental fields
City Council Document Type
City Council Packets
Date
7/25/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. The Supreme Court made a decision that will probably have a major <br /> impact on Police Departments. The Court said that all custodial <br /> interrogations must be "electronically recorded". That means that we <br /> will have buy more tape recorders and tapes. Henn. Co. has requested <br /> a stay on this decision. If the stay is denied, we will have to money <br /> that has not been budgeted. <br /> 5. Reed Krogh broke his foot (no he didn't put in mouth). He is on <br /> Vacation now, but will miss at least a week upon his return. <br /> 6. On Tuesday, about one-third of the squad room floor was flooded <br /> with water. The problem was traced to a construction flaw. Tim C. was <br /> notified and the problem is being solved. Undetermined damage at this <br /> time. The Parade and Festival went well. The Chief is still concerned <br /> about the "Gaps" in the Parade. He is not sleeping well at night. <br /> Tim R. <br /> PUBLIC WORKS <br /> Final revisions for the patching contract were edited last week, and ads were <br /> placed in the New Brighton Bulletin and Construction Bulletin. The quantities in this <br /> contract are less than last year. Two additions will be replacement of the <br /> driveways at the well pump houses, and replacement of the walk paths in the city. <br /> These two portions of the contract will be paid for by their respective departments. <br /> A staff report will be prepared for the August 1 , 1994 work session, but will be <br /> distributed by hand that night as the bid opening is that Monday. <br /> Staff has also completed a visual inspection of the roads for sealcoating. Staff is <br /> recommending that approximately 41 ,000 square yards be sealcoated. Since this is <br /> a relatively small project, staff is requesting that slurry sealing be performed this <br /> year. Staff visited Mendota Heights last year when they were performing this <br /> method of sealing. Mendota Heights has been using this procedure for the last 6 <br /> years with excellent results. The benefits of Slurry sealing is, there is no loose rock <br />
The URL can be used to link to this page
Your browser does not support the video tag.