My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1994/07/25
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1994
>
Agenda Packets - 1994/07/25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:10 PM
Creation date
7/2/2018 7:52:33 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/25/1994
Supplemental fields
City Council Document Type
City Council Packets
Date
7/25/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Summary Field Report <br /> Project: Mounds View Golf Links and Practice Center <br /> Owner: City of Mounds View <br /> Contractor: Veit Companies <br /> Field Report No.: 17 <br /> Date of Report: 14994 <br /> Date of Site Visit: y Jul ,' <br /> July 13, 1994 <br /> Prepared by: Paul Miller <br /> Williams, Gill&Associates, Golf Course Architects <br /> 421 North Main Street, River Falls, WI 54022 <br /> Phone (715) 425-9511 <br /> Prepared for: City of Mounds View, Mary Saarion - Project Manager <br /> Present at Site: Garrett Gill, Paul Miller, Williams, Gill&Associates(WGA) <br /> Kurt Johnson, City of Mounds View <br /> Randy Dryden, Veit <br /> Weather: clear, 60's <br /> Work in progress: installing drain tile on no. 2 green, grading around parking lot <br /> General Comments: <br /> WGA reviewed the work done to date. Discussed divider fence location. Discussed cart path routing <br /> along no. 1 tees, no 3 tees and no. 8 tees. Reviewed irrigation pipe crossing/connection on bridge- <br /> approved. Discussed grading of mounds on the left side of 8 fairway. Discussed/reviewed the boardwalk <br /> installation. The Blaine interceptor contractor has removed a key tree near the bunkers on no. 5. The <br /> stump remains and needs to be removed. WGA to follow up on compensation for removal of the tree. <br /> Directions to Contractor: <br /> 1. Veit to install divider fence on the practice tee as shown on the plan -pole behind tee line. <br /> 2. Cart path along the tees should run parallel to the tees where possible within 6'of the tee. The 6' <br /> between the tee and cart path will be sodded. WGA to review cart path grading prior to installation of <br /> class 5. <br /> 3. Evergreen to provide WGA with a price to irrigate the parking lot and turf nursery area as discussed on <br /> site. The parking lot will have separate control. The west side of the entrance drive to be irrigated <br /> with 5- half circles connected to the range irrigation. <br /> 4. Veit to eliminate approximately 15'off the back of no. 8 tee to soften grade from 2:1 to 3:1. <br /> 5. Veit to eliminate 75'of cart path at no. 7 green. <br /> 6. Veit to eliminate 75'of cart path at no. 5 green. <br /> 7. WGA approved Evergreen installing irrigation pipe along the base of the practice green cavity. <br /> 1 Williams, Gill & Associates, Golf Course Architects <br />
The URL can be used to link to this page
Your browser does not support the video tag.