Laserfiche WebLink
• <br /> PUBLIC WORKS <br /> 1994 2ND QUARTERLY REPORT <br /> SEWER DEPT: <br /> * Assisted the Street Dept . with cracked sealing. <br /> * Cleaned, cut roots, removed debris, and televised several <br /> locations in the storm sewer system to verify some off-set <br /> pipes and separated joints . <br /> * Repaired storm sewer separations <br /> * Assisted N. St . Paul & Blaine with the camera <br /> * Performed cross training with new employees <br /> * Inspection on water main break on Edgewood Dr. for J.M. S . <br /> Contractors . <br /> * Assisted on water main breaks . <br /> * Clean and televise sanitary sewer. <br /> * The new video printer installed last winter works great, <br /> it saves a lot of time. <br /> WATER DEPT: <br /> * 132 , 882 , 000 total gallons pumped in the 2nd quarter of 1994 <br /> * Continued working on treatment plants 2 and 3 (onging) <br /> * Flush systems installed or upgraded at all 3 filter plants <br /> * Couple of water service leaks repaired <br /> * Well roofs and tuckpointing <br /> * Hydrant painting <br /> * Flushed hydrants <br /> * Bill Hanson & Bill Hanggi attended Rural Water School in April <br /> * Attended class on Proper Care of Your Back "Save A Back" <br /> STREET DEPT: <br /> * Assisted on repair of water main/service leaks . <br />