Laserfiche WebLink
* Crack sealed- 13 , 000 lbs . <br /> * Installation of 15-20 no parking/next street signs <br /> * Change-replaced / repair 2 dozen stop signs . <br /> * Completed inspection/evaluation of the streets for <br /> sealcoating. Marked street for necessary reconstruction <br /> and repair. <br /> * Completed street sweeping plus additional areas, as needed. <br /> * Repaired 15+ catch basins in the storm drain system. <br /> * Manufactured trailer for traffic controls . <br /> * Trimmed Blvd. trees as needed in areas where we mow. <br /> * Repaired Blvds . from construction projects <br /> * City Hall Police Dept . repairs . <br /> * Hung bulletin boards, shelving, run cable, etc . <br /> * Misc . pothole & street signs repairs <br /> * Attended Sweeper Seminar <br /> SHOP DEPT: <br /> * 2-squads put into service <br /> * Mounted radios in all City Hall staff cars . <br /> * Major suspension work on two trucks . <br /> * Re-arranged supply room to new location <br /> * Rebuilt electric motor for propane filling stat . <br /> * Ran wire to Parks office for base radio (contractors forgot) . <br /> * Installed new radial saw in wood shop area . <br /> * Ran water line to outside hydrant for washing off equipment <br /> on northwest side of building. <br /> * Maintaining vehicles on regular basis . <br />