Laserfiche WebLink
Flow monitoring equipment will enable staff to conduct flow test on the system to help <br />determine areas of infiltration and possible sump pump discharge areas. <br />Estimated cost: $ 5,000. Underground Inspection. <br />Portable concrete mixer, see SWM <br />Estimated cost: $ 700. Utility Infrastructure and Equipment Maintenance. <br />* Dewatering system, see Water <br />Estimated cost: $ 3,000. <br />1996 - 1999 CAPITAL EXPENDITURES <br />See LTFP Capital Worksheet <br />49 <br />