Laserfiche WebLink
Summary Field Report <br /> Project: Mounds View Golf Links and Practice Center <br /> Owner: City of Mounds View <br /> Contractor: Veit Companies <br /> Field Report No.: 18 <br /> Date of Report: July 21, 1994 <br /> Date of Site Visit: July 21, 1994 <br /> Prepared by: Paul Miller <br /> Williams, Gill&Associates,Golf Course Architects <br /> 421 North Main Street, River Falls,WI 54022 <br /> Phone (715) 425-9511 <br /> Prepared for: City of Mounds View, Mary Saarion - Project Manager <br /> Present at Site: Paul Miller,Williams,Gill&Associates(WGA) <br /> Darren Olson <br /> Kurt Johnson, City of Mounds View <br /> Randy Dryden, Veit <br /> Weather: rainy, 60's <br /> Work in progress: grading for cart path, installing sprinkler heads,clearing for fence around <br /> practice range, installing topmix on the tees <br /> General Comments: <br /> WGA reviewed the work done to date. Reviewed cart path grading. Approved cart path along no. 9 tees, <br /> by no. 8 green with the modification noted below, by no. 7 green and tees, by no. 6 green and tees.with <br /> the modification listed below, by no. 1 tees. The mounds on the left side of no.8 fairway have been <br /> regraded and look good. The board walk is installed. The fence staking was approved. Kurt will mark <br /> trees for removal within the selectively cleared area on the left side of the range to match the right side of <br /> the range in terms of finished clearing. The fence location at the back side of the range was discussed. <br /> The fence should end at the oak trees as discussed. Kurt has cleaned up the trees on the right side of <br /> the range. The selective clearing right of no. 2 fairway was discussed. <br /> Directions to Contractor: <br /> 1. Veit to relocate the cart path behind no. 8 green away from the green as discussed with Randy. <br /> 2. Veit to relocate the cart path near no. 6 tee to place the manhole in the center of the path as indicated <br /> on the plans. <br /> 3. Several low areas need to be graded out on no. 8 fairway. <br /> 4. The back of no. 8 tee should be shortened by 12' -15' to soften the slope to the ditch as discussed <br /> on site visit 17. <br /> 5. The swale shown on the plans behind the beach bunker on no. 6 needs to be installed. Approved <br /> building berm along the back side of the bunker to help create the swale because the pond liner is 1' <br /> below the surface. <br /> 1 Williams, Gill & Associates, Golf Course Architects <br />