Laserfiche WebLink
6. Veit to provide a cost for connecting the electrical to the clubhouse. <br />7. Selective clearing to take place between the range and the chain Zink fence to be installed. <br />8. Directed Randy to be sure to get a minimum of 3" of topmix on the tees. <br />9. Informed Randy that we are waiting for information regarding the gas line location. We will need to <br />install sleeves at Minnigasco's direction prior to paving . <br />10. Directed Veit to have Keller add 150' of fence / netting along the right side of the practice tee (under <br />the drip line of the trees on the parking lot side. <br />11. The selectively cleared areas (except the wetlands clearing to the right of no. 2 tees) need to be <br />prepped and seeded as noted on the plans. <br />12. Veit to verify that maximum slope on the cart path to no. 1 tees is 10%. <br />cc: Kurt Johnson, City of Mounds View <br />Randy Dryden, Veit Companies <br />Jerry Rachel, Veit Companies <br />Note: Please make corrections or additions below and return to Williams, Gill so that this report may be <br />amended. <br />2 Williams, Gill & Associates, Golf Course Architects <br />