My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1994/08/08
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1994
>
Agenda Packets - 1994/08/08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:26 PM
Creation date
7/2/2018 8:37:44 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
8/8/1994
Supplemental fields
City Council Document Type
City Council Packets
Date
8/8/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Summary Field Report <br />Project: Mounds View Golf Links and Practice Center <br />Owner: City of Mounds View <br />Contractor: Veit Companies <br />Field Report No.: 18 <br />Date of Report: July 21, 1994 <br />Date of Site Visit: July 21, 1994 <br />Prepared by: <br />Paul Miller <br />Williams, Gill & Associates, Golf Course Architects <br />421 North Main Street, River Falls, WI 54022 <br />Phone (715) 425-9511 <br />Prepared for: City of Mounds View, Mary Saarion - Project Manager <br />Present at Site: <br />Paul Miller, Williams, Gill & Associates (WGA) <br />Darren Olson <br />Kurt Johnson, City of Mounds View <br />Randy Dryden, Veit <br />Weather: rainy, 60's <br />Work in progress: grading for cart path, installing sprinkler heads, clearing for fence around <br />practice range, installing topmix on the tees <br />General Comments: <br />WGA reviewed the work done to date. Reviewed cart path grading. Approved cart path along no. 9 tees, <br />by no. 8 green with the modification noted below, by no. 7 green and tees, by no. 6 green and tees with <br />the modification listed below, by no . 1 tees. The mounds on the left side of no. 8 fairway have been <br />regraded and look good. The board walk is installed. The fence staking was approved. Kurt will mark <br />trees for removal within the selectively cleared area on the left side of the range to match the right side of <br />the range in terms of finished clearing. The fence location at the back side of the range was discussed. <br />The fence should end at the oak trees as discussed. Kurt has cleaned up the trees on the right side of <br />the range. The selective clearing right of no. 2 fairway was discussed. <br />Directions to Contractor: <br />1. Veit to relocatethecart path behind no. 8 green away from the green as discussed with Randy. <br />2. Veit to relocate the cart path near no. 6 tee to place the manhole in the center of the path as indicated <br />on the plans. <br />3. Several low areas need to be graded out on no. 8 fairway. <br />4. The back of no. 8 tee should be shortened by 12' - 15' to soften the slope to the ditch as discussed <br />on site visit 17. <br />5. The swale shown on the plans behind the beach bunker on no. 6 needs to be installed. Approved <br />building berm along the back side of the bunker to help create the swale because the pond liner is 1' <br />below the surface. <br />1 Williams, Gill & Associates, Golf Course Architects <br />
The URL can be used to link to this page
Your browser does not support the video tag.