Laserfiche WebLink
PUBLIC WORKS <br /> * Staff assisted in the election setup and take down this week. This is a task that we look <br /> forward to every couple of years. Of course the Public Works staff thanks Michele for the 2 <br /> dozen donuts she left the morning after the election!!! <br /> * Staff completed the pouring of concrete for the material storage bins last week. Now we are <br /> disassembling the forming material and preparing them for use. <br /> * Staff is still changing equipment, preparing for the winter season. We've been very fortunate <br /> thus far, but something tells us we don't have many more weeks left like this past one. <br /> * Staff is sweeping leaves this week on the north side of the City. <br /> A minor breakdown occurred, it was repaired and the sweeper was back in service later in the <br /> week. Staff will move to the south side of the City some time next week. <br /> * The Water Division is wrapping up the remainder of the hydrant pumping this week, and <br /> beginning to winterize the treatment plants. They also have a list of meters to check for <br /> improper readings, non-operating meters, and faulty remotes. <br /> * Staff has reviewed a sample RFP for the Automatic Meter Reading conversion this week I <br /> will finalize it next week, and submit it for advertising. It is possible that staff will have <br /> enough information available for discussion at the December work session. <br /> Mike <br />