Laserfiche WebLink
EXHIBIT 4 <br /> ADDITIONAL STIPULATIONS <br /> 1) Sanitary Sewer, Storm Sewer and Watermains shall be installed per the direction <br /> of the City Consulting Engineer and the Director of Public Works and, the <br /> installation of each shall allow for the future extension to Ardan Avenue <br />