My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2010/02/22
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2010
>
Agenda Packets - 2010/02/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:32 PM
Creation date
7/3/2018 11:15:54 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/22/2010
Supplemental fields
City Council Document Type
City Council Packets
Date
2/22/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2009 Annual Report | Public Works Department <br />Page 4 <br />Hillview Park Water Service Pipe Replacement <br />PW staff performed construction to upgrade the 1-inch water service to the Hillview Park Building to <br />provide better capacity to meet irrigation demands at the park. Construction included trenching and <br />installing about 400 feet of 2-inch polyethylene water supply pipe to the building, including <br />reconnections inside the building. <br />Capital Improvement Projects: <br />Summer 2009 in Mounds View will be remembered by the Public Works Department as the first year <br />of street construction for with the Streets and Utilities Program. Five miles of streets and utilities <br />were reconstructed as part of the 2009 Street and Utility Improvement Project - Area A. Thirteen <br />contractors bid the project January 29, 2009 with the low bid submitted by North Valley, Inc. of <br />Nowthen, Minnesota for $3,948,859, nearly $600,000 less than the engineer’s estimate. Currently, <br />the project cost is tracking about $400,000 below that of the contract, or close to $1,000,000 below <br />that of the engineer’s estimate at the time of bidding. Only one change order was issued for the <br />project, which added manhole-to-manhole sliplining of the sewer in lieu of stint repairs. <br /> <br />A tremendous amount of PW staff time and effort has been invested in the Area A project. PW staff <br />were involved with project coordination; inspection; reviewing and approving contract documents; <br />utility locates; providing record drawings; permitting, coordination with private utilities; progress <br />meetings; administering the private improvement program; fabricating mailbox posts and <br />supplying/marking mailboxes; ordering traffic signs; and many, many phone calls and <br />correspondences. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />storm sewer construction street excavation and grading <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />street paving on Edgewood Drive street paving in Silver Lake Woods
The URL can be used to link to this page
Your browser does not support the video tag.