Laserfiche WebLink
2010 Q2/Q3 Report | Public Works Department <br />Page 4 <br /> Added electric motor to project <br /> 2009 City Hall Electrical Service Entrance Modifications (complete) <br /> 2010 Miscellaneous Concrete Repairs* (construction, complete) <br /> Greenfield Park Improvements/Mark Wisser Memorial Field (construction, complete) <br /> Wellhead Protection Program (planning) <br />*engineering performed in-house <br />Operation & Maintenance: <br /> General O&M <br /> 18 call-back events <br /> Safety Committee activities <br /> Budget considerations <br /> Pole camera procurement <br /> Drinking Water - supply, treat, store, and distribute drinking water <br /> 156.5 million gallons pumped <br /> 0 watermain breaks / 6 water service breaks <br /> 24 water samples taken <br /> 279 Gopher State One Call locates (includes countless hours of locating for street project) <br /> State samples for Lead and Copper <br /> Replaced broken check valve at treatment plant #1 <br /> Quarterly Water Readings <br /> Worked with contractor to replace 3 main line valve in project area C <br /> Completed the remaining 20% of valves to be checked for operation <br /> Brought hydrant nozzle sections to Central Sandblasting for blasting, priming, and City staff <br />painting <br /> Raised 15 hydrants to proper height and fabricated hydrant parts for raising hydrants <br /> 52 meter repair appointments (sent out 61 repair notice letters) <br /> Shut off 6 water services for internal repairs <br /> 2 residential water tests <br /> 1 hydrant flow test <br /> Replaced battery back up for Bronson Lift Station <br /> Cleared brush from around Treatment Plant #1 <br /> Pressure washed, prepped and painted Treatment Plant #1 <br /> Pressure washed Reservoir and Booster Station <br /> Repaired lights on pathway from Silver Lake to County Rd I <br /> Cleaned and sharpened all chain saws August 17th and 18th <br /> Replaced broken contactor for well #1 air compressor <br /> Verified operation of all valves in area D <br /> Cleaned bone yard area <br /> Fabricated and constructed heating system for back fill storage including storage bin <br /> Wastewater Collection - collect and transport wastewater <br /> Cleaned approx. 22 miles sanitary sewer (complete) <br /> Mailed root blockage notices to property owners <br /> 2 lift stations operated/maintained <br /> Televised all sanitary and storm sewer in Area E <br /> Stormwater - collect and treat stormwater runoff, flood protection <br /> Cleared various storm drain inlet blocks from ice/snow <br /> Swept 43+ miles of streets <br /> Inspect catch basins and storm sewer in Area B/C for warrantee issues <br /> Inspect/evaluate stormwater infiltration basin performance <br /> Cleaned all City-owned stormwater pond outfalls and control structures <br /> Streets & Trails - manage pavements, snow/ice control, traffic control, street lights <br /> 204+ tons asphalt used for street repair/patching