My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2009/07/13
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2009
>
Agenda Packets - 2009/07/13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:59 PM
Creation date
7/4/2018 11:11:34 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/13/2009
Supplemental fields
City Council Document Type
City Council Packets
Date
7/13/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
July 13, 2009 Item No. 7F <br />Page 2 <br />On June 2, 2009 the Streets and Utilities Committee held a Public Information Meeting <br />to review non-standard issues and gather public feedback within both Areas B and C of <br />the Street and Utility Improvement Program. <br />On June 15, 2009 the Streets and Utilities Committee approved recommendations on a <br />portion of the issues reviewed at the June 2nd Public Information Meeting. <br />On July 6, 2009 the Streets and Utilities Committee reviewed their recommendations <br />from June 15th with the City Council at the Council Work Session. <br />Discussion <br />The Area A Street and Utility Improvement Project has been successfully designed, with <br />bids received in January 2009. Due to the economic climate, bidding for the project was <br />extremely aggressive which resulted in construction costs being approximately 15% <br />below the Engineer’s Estimate for the project. Likely factors contributing to the good <br />bidding climate include the size of the project (approximately 5.0 miles) and the current <br />economic situation. <br />The feasibility report for project Area B was originally completed in 2005. The project <br />was later petitioned against and suspended, with plans never being ordered. The Street <br />and Utility Improvement Program approved by Resolution 7176 proposed Area B for <br />2010 construction with plans scheduled to be ordered in June 2009. The cost estimates <br />for the work to be done in Area B, which had originally been prepared for the Report on <br />the 2005 Street Improvement Project, have now been updated. A copy of the updated <br />cost estimates, along with a cover letter dated July 8, 2009, are included with this Staff <br />Report for reference. <br />Under the Street and Utility Improvement Program, Project Area C was originally <br />scheduled for construction in 2011. However, due to the competitive bidding <br />atmosphere, the Mounds View City Council has chosen to evaluate the feasibility of <br />performing the improvements within Area C at an earlier date than originally anticipated. <br />The Council ordered preparation of the feasibility report for Area C in March 2009. The <br />report has just been completed, and was considered for approval under an earlier <br />agenda item on the July 13, 2009 City Council meeting. <br />Based on the typical project schedule for the Street and Utility Improvement Program, <br />the time has arrived to order the construction documents for the 2010 construction <br />season. Per the original Program schedule the 2010 project is to be Area B. However, <br />now that the feasibility report for Area C has been completed, the Council can consider <br />whether it wishes to pursue a combined project of Areas B and C for 2010 construction.
The URL can be used to link to this page
Your browser does not support the video tag.