November 10, 2008 Item No. 7C <br />Page 3 <br />Proposed Improvements <br />It is proposed that the existing concrete curb and gutter be left in place to the <br />maximum extent possible. It is only proposed to replace only those existing <br />individual sections of curb that are damaged. <br />The structural section of the street between the existing curbs is proposed to be <br />rehabilitated through a process of reclamation and overlay. The new street <br />section that would be constructed would be identical to the City standard <br />adopted under Resolution 7176 for the Street and Utility Improvement Program. <br />The existing street pavement would be ground up and mixed with the gravel and <br />sand beneath it, creating a new recycled gravel base. This recycled base would <br />be temporarily removed from the street, so the subgrade below can be shaped to <br />the appropriate elevation and slope for the new street section. Once the <br />subgrade is prepared, the recycled gravel would be placed back into the street <br />bed. New gravel would be added as necessary to produce the total required <br />thickness. The gravel would be prepared, and then the new bituminous <br />surfacing would be paved on the streets. <br />A small amount of improvements would also be performed to the existing storm <br />sewer at the low point of Lake Court Drive. <br />Permits <br />A permit from the Rice Creek Watershed District would be required for the improvements <br />to Lake Court Drive and Lake Court Circle. The improvements for these streets were <br />included on the completed plans and specifications submitted to the RCWD as part of the <br />permit application for the 2003 Street Improvement Project. The findings of the permit <br />application for the 2003 Street Improvement Project were that no additional stormwater <br />improvements (such as infiltration swales) were required along Lake Court Drive or Lake <br />Court Circle. <br />We have made initial contact with RCWD regarding the current proposal to perform the <br />improvements to Lake Court Drive and Lake Court Circle. We have supplied them with the <br />original information from the 2003 Street Improvement Project, and have requested an <br />opinion whether their findings from that project can be re-applied to the current proposal. <br />We are hopeful that RCWD will concur that the findings from the 2003 Project permit <br />application are still appropriate, but as of the time this Staff Report was prepared we had <br />not received an official response. <br />All requirements of the new RCWD permit would need to be included in the public <br />improvement project for the streets.