November 10, 2008 Item No. 7A <br />Page 2 <br />Based on discussions with the Streets and Utilities Committee, a second option was <br />developed for potential parking at Hillview Park. This second option proposed angled <br />parking along the north side of Hillview Road for the entire length from Long Lake Road to <br />Greenwood Drive. Figure 2 attached to this Staff Report shows the layout of this option. <br />In addition to the proposals along Hillview Road, an option was also developed for <br />Greenwood Drive. The option consisted of a “bump out” along the east side of Greenwood <br />Drive adjacent to the park. The primary purpose of this option was to reduce congestion <br />for the through traffic on Greenwood Drive when parked vehicles were present. <br />The following table summarizes the existing condition and the options that have been <br />considered. The table includes number of parking stalls and additional cost to the <br />2009-2010 Street and Utility Improvement Project. <br />Street Option # of parking stalls Additional Cost <br />Hillview Road Existing 15 (all parallel)$0 <br />Option 1 (“short”) 21 (15 angled + 6 parallel)$28,700 <br />Option 2 (“long”) 27 (all angled)$60,000 <br />Greenwood Drive Existing 11 (all parallel)$0 <br />“Bump Out”9 (all parallel)$11,500 <br />The Streets and Utilities Committee received public input on June 14, 2008 on the various <br />options. On June 16, 2008 the Committee passed a motion recommending that Option 2 <br />(the “long” option) be selected for Hillview Road and that the “Bump Out” option be <br />selected for Greenwood Drive. <br />Council agreed with the recommendations from the Streets and Utilities Committee and <br />passed Resolution 7307 on July 28, 2008. A copy of Resolution 7307 has been attached <br />to this Staff Report. The resolution states the maximum number of angled parking stalls <br />shall be constructed along the north side of Hillview Road, from Long Lake Road to <br />Greenwood Drive, including an off-street concrete sidewalk. The resolution further states <br />that a “bump out” lane shall be constructed along the east side of Greenwood Drive <br />adjacent to Hillview Park. The resolution states the intent that the improvements would be <br />financed by the Park Dedication Fund, pending final financial review. <br />The Parks Commission has raised concerns regarding Resolution 7307. Their concerns <br />are regarding the proposed financing and the physical impact that the proposed angled <br />parking stalls and sidewalk would have on the park property. <br />A joint meeting between the Streets and Utilities Committee and the Parks Commission <br />was held on October 20, 2008 to discuss the issues. No consensus was reached.