My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1994/06/27
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1994
>
Agenda Packets - 1994/06/27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:40 PM
Creation date
7/6/2018 10:42:35 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
6/27/1994
Supplemental fields
City Council Document Type
City Council Packets
Date
6/27/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
along the left front edge of the green. The subgrade for no. 6 green was accepted. <br /> The detail for the beach bunker was reviewed with Dick Hibbard. The purpose of the <br /> sand bags are to create a lip that will keep sand from washing into the pond as <br /> discussed on site. <br /> No. 5 green was reviewed. The smile drain on the back side of the green needs to be <br /> installed with Kurt to verify prior to greensmix installation. The bottom of the cavity <br /> needed smoothing out. The grades between bunkers and the green and around the <br /> green are correct . <br /> Paul and Kurt looked at Kenco's work on the Blaine interceptor. It would appear that <br /> Kenco has installed around 600' of pipe with around 750' remaining to be installed. <br /> Gary Rohling pointed out that no. 4 tee has been driven across with heavy equipment <br /> and will require regrading. <br /> No. 3 green was reviewed. To,pmix and bunker sand has been placed. Green looks <br /> good. <br /> Rohling Green has removed the class 5 from the target bunkers for revised grading. <br /> WGA to review target bunkers prior to reinstalling the class 5. <br /> Paul and Kurt reviewed both ponds. The liner for pond A was being installed. The <br /> liner installer indicated that they will need additional material to finish the job. They <br /> will be finished sometime next week. The liner has been installed on pond Pond B. It <br /> was being filled by the dewatering wells. It had 2' of water in the bottom. Side slopes <br /> and pond grading looked excellent. <br /> The well contractor is ready to test the well. They indicated that they should be done <br /> within a week and a half. <br /> Directions to Contractor: <br /> 1 . The finish grading of the golf course will require stakes be set per the line of <br /> play and dimensions as established on the green details. Currently the <br /> swales are undefined and the transition between mounds and surrounding <br /> areas is not as indicated on the plans. The finished grading needs to be <br /> reviewed by the golf course architect prior to approval for seeding / finish <br /> preperation. <br /> 2. Paul directed Rohling Green to modify bunker shapes on no. 8 green bunker, <br /> no. 8 fairway bunkers, and no. 5 bunker. They also needed to smooth green <br /> cavity bottoms on no. 5 green and no. 8 green. They need to install <br /> additional drain tile on no. 5 green and no. 7 green. <br /> 2 Williams, Gill & Associates, Golf Course Architects <br />
The URL can be used to link to this page
Your browser does not support the video tag.