My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-12-1993 CC
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1993
>
04-12-1993 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:24 PM
Creation date
7/9/2018 6:05:21 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/12/1993
Supplemental fields
City Council Document Type
City Council Packets
Date
4/12/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View City Council Page Three <br /> Regular Meeting April 12, 1993 <br /> Farris reported that using the peak population and household figures <br /> determined by the planning/consultant,and applying the MWCC standard flow <br /> rates per acre to commercial/industrial property, the MWCC's hydraulics <br /> consultant, Environscience, Inc. , determined the maximum average daily flow <br /> for both development scenarios. It was determined that the figures <br /> forecasted for the unconstrained scenario would govern the design of the <br /> Blaine Interceptor. <br /> Harris reported that with the design of the Blaine Interceptor having been <br /> previously established as a gravity sewer, the alternatives for the <br /> interceptor sewer were generally relegated to differences in alignment <br /> corridors. Fourteen alignment alternatives were examined with three being <br /> chosen for further investigation. Alternative 1 would begin within a 40 <br /> foot drainage easement and between Lots 1 and 2 of the North Star Industrial <br /> Park in Blaine. From there it runs south into Mounds View along the west <br /> and north rights-of-way lines. of I-35W and T.H. 118, respectively. The <br /> route of this alternative then crosses T.H. 118, perpendicular to and under <br /> T. H. 118, to Quincy Street, where the route continues southward in the <br /> boulevard/green space on the east side of Quincy Street to its connection <br /> with the North Suburban Interceptor. <br /> Alternate 2 also begins within the 40 foot drainage easement and between <br /> Lots 1 and 2, Block 2 of the North Star Industrial Park in Blaine. From <br /> there it runs south along the west right-of-way line of I-35W to a point 20 <br /> et north of the, south line of Lot 7 of the North Star Industrial Park. <br /> MillEom there the route of this alternative runs due west within a 40 foot <br /> drainage easement lying parallel to and contiguous with the south lot line <br /> of Lot 7, to a point approximately due north of Quincy Street. From there <br /> the route runs south into Mounds View, across the property currently being <br /> considered for development as a golf course by the City of Mounds View, to <br /> the point of crossing at T. H. 118 described for Alternative 1 above. <br /> Alternative 2 then follows the same route as Alternative 1 to its connection <br /> with the North Suburban Interceptor. <br /> Alternative 3 begins within a 40 foot drainage easement and between Lots 1 <br /> and 2, Block 2 of the North Star Industrial Park in Blaine. From there it <br /> follows the same route into Mounds View as Alternative 1, to the point of <br /> crossing at T. H. 188. After crossing T. H. 118 in the manner described for <br /> Alternative 1, the route of Alternative 3 turns and runs in a southwesterly <br /> direction to. a point on the northern end of a north-south alignment located <br /> west of the apartment buildings abutting the west side of Quincy Street. <br /> The route then runs due south along the east edge of Greenfield Park to its <br /> connection with the North Suburban Interceptor. <br /> Karen Shick, Environscience, Inc. , environmentalist, stated that from an <br /> environmental standpoint, any of the three alternative interceptor <br /> alignments could be implemented. No permanent or long-term adverse <br /> environmental impacts should result from the implementation of any of the <br /> three alternative interceptor alignments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.